If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 31-013-22344 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":42.326349999,"lon":-79.53476999,"icon":""}]} |
Well Name: Schofield, R 1 | |
Country: United States | |
State: New York | |
County: Chautauqua | |
Municipality: Westfield | |
Operator Name: Schreiner Oil and Gas Inc. | |
Well Status: Not Reported | |
Spud Date: 1993-02-12 | |
Permit Date: 1992-12-29 | |
Well Completion Date: 1993-03-04 | |
Configuration: Vertical | |
Measured Well Depth (ft): 2667 | |
Latitude: 42.326349999 | |
Longitude: -79.53476999 |
For data sources see[1]
Period | Operator Name | Fluid Type | Fluid Quantity | Fluid Production Time |
---|---|---|---|---|
1993 | Schreiner Oil and Gas Inc. | Gas | 8503.00 Mcf | 8 Months |
1994 | Schreiner Oil and Gas Inc. | Gas | 8492.00 Mcf | 12 Months |
1995 | Schreiner Oil and Gas Inc. | Gas | 5517.00 Mcf | 12 Months |
1996 | Schreiner Oil and Gas Inc. | Gas | 3704.00 Mcf | 12 Months |
1997 | Schreiner Oil and Gas Inc. | Gas | 2391.00 Mcf | 6 Months |
1998 | Schreiner Oil and Gas Inc. | Gas | 2273.00 Mcf | 12 Months |
1999 | Schreiner Oil and Gas Inc. | Gas | 2185.00 Mcf | 12 Months |
2000 | Schreiner Oil and Gas Inc. | Gas | 2144.27 Mcf | 12 Months |
2001 | Schreiner Oil and Gas Inc. | Gas | 2138.00 Mcf | 12 Months |
2001 | Schreiner Oil and Gas Inc. | Oil | 0.00 Bbl | 12 Months |
2002 | Schreiner Oil and Gas Inc. | Gas | 1688.00 Mcf | 12 Months |
2002 | Schreiner Oil and Gas Inc. | Oil | 0.00 Bbl | 12 Months |
2003 | Schreiner Oil and Gas Inc. | Gas | 1570.57 Mcf | 12 Months |
2004 | Schreiner Oil and Gas Inc. | Gas | 1467.00 Mcf | 12 Months |
2006 | Schreiner Oil and Gas Inc. | Gas | 1505.00 Mcf | 12 Months |
2006 | Schreiner Oil and Gas Inc. | Oil | 0.00 Bbl | 12 Months |
2007 | Schreiner Oil and Gas Inc. | Gas | 1188.00 Mcf | 12 Months |
2008 | Schreiner Oil and Gas Inc. | Gas | 961.00 Mcf | 12 Months |
2009 | Schreiner Oil and Gas Inc. | Gas | 953.00 Mcf | 12 Months |
2009 | Schreiner Oil and Gas Inc. | Oil | 0.00 Bbl | 12 Months |
2010 | Schreiner Oil and Gas Inc. | Gas | 902.00 Mcf | 12 Months |
2010 | Schreiner Oil and Gas Inc. | Oil | 0.00 Bbl | 12 Months |
2011 | Schreiner Oil and Gas Inc. | Gas | 722.00 Mcf | 12 Months |
2011 | Schreiner Oil and Gas Inc. | Oil | 0.00 Bbl | 12 Months |
2012 | Schreiner Oil and Gas Inc. | Gas | 882.00 Mcf | 12 Months |
2012 | Schreiner Oil and Gas Inc. | Oil | 0.00 Bbl | 12 Months |
2013 | Schreiner Oil and Gas Inc. | Gas | 892.00 Mcf | 12 Months |
2013 | Schreiner Oil and Gas Inc. | Oil | 0.00 Bbl | 12 Months |
2014 | Schreiner Oil and Gas Inc. | Gas | 604.00 Mcf | 12 Months |
2014 | Schreiner Oil and Gas Inc. | Oil | 0.00 Bbl | 12 Months |
2015 | Schreiner Oil and Gas Inc. | Gas | 747.00 Mcf | 12 Months |
2015 | Schreiner Oil and Gas Inc. | Oil | 0.00 Bbl | 12 Months |
2016 | Schreiner Oil and Gas Inc. | Gas | 0.00 Mcf | 0 Months |
2016 | Schreiner Oil and Gas Inc. | Oil | 0.00 Bbl | 0 Months |
For data sources see[2]
Period | Operator Name | Waste Type | Waste Quantity | Time Produced |
---|---|---|---|---|
1993 | Schreiner Oil and Gas Inc. | WATER | 150 Bbl | 8 Months |
1994 | Schreiner Oil and Gas Inc. | WATER | 0 Bbl | 12 Months |
1995 | Schreiner Oil and Gas Inc. | WATER | 310 Bbl | 12 Months |
1996 | Schreiner Oil and Gas Inc. | WATER | 0 Bbl | 12 Months |
1997 | Schreiner Oil and Gas Inc. | WATER | 20 Bbl | 6 Months |
1998 | Schreiner Oil and Gas Inc. | WATER | 0 Bbl | 12 Months |
1999 | Schreiner Oil and Gas Inc. | WATER | 45 Bbl | 12 Months |
2000 | Schreiner Oil and Gas Inc. | WATER | 138 Bbl | 12 Months |
2001 | Schreiner Oil and Gas Inc. | WATER | 0 Bbl | 12 Months |
2002 | Schreiner Oil and Gas Inc. | WATER | 0 Bbl | 12 Months |
2006 | Schreiner Oil and Gas Inc. | WATER | 17 Bbl | 12 Months |
2007 | Schreiner Oil and Gas Inc. | WATER | 0 Bbl | 12 Months |
2008 | Schreiner Oil and Gas Inc. | WATER | 0 Bbl | 12 Months |
2009 | Schreiner Oil and Gas Inc. | WATER | 0 Bbl | 12 Months |
2010 | Schreiner Oil and Gas Inc. | WATER | 0 Bbl | 12 Months |
2011 | Schreiner Oil and Gas Inc. | WATER | 0 Bbl | 12 Months |
2012 | Schreiner Oil and Gas Inc. | WATER | 0 Bbl | 12 Months |
2013 | Schreiner Oil and Gas Inc. | WATER | 0 Bbl | 12 Months |
2014 | Schreiner Oil and Gas Inc. | WATER | 0 Bbl | 12 Months |
2015 | Schreiner Oil and Gas Inc. | WATER | 0 Bbl | 12 Months |
2016 | Schreiner Oil and Gas Inc. | WATER | 0 Bbl | 0 Months |
For data sources see[2]
Event Date | Event Description |
---|---|
1992-12-29 | New Permit Issued. |
1993-02-12 | Drilling started |
1993-03-04 | Drilling completed |
Effective Date | Old Operator Name | New Operator Name |
---|---|---|
2020-07-27 | Schreiner Oil and Gas Inc. | Greenridge Oil Company LLC |
For data sources see[4]