| INSPECTION ID
|
DATE
|
DESCRIPTION
|
COMMENT
|
VIOLATION ID
|
VIOLATION CODE
|
VIOLATION_COMMENT
|
| -3452266
|
2012-07-31
|
|
On the day of my inspection I found the pump unit to be running, there is a separator/ drip/ chart/ brine tank and (1) two hundred ten barrel production tank setting inside a containment dike, the I.D. is posted.
|
|
|
|
| -385039128
|
2011-08-31
|
|
Inspection revealed that restoration work at site is satisfactory, pit has been filled in and site restored and vegetation has been established.
|
|
|
|
| 1030094112
|
2014-08-25
|
|
Onsite with Inspector Doug Bennett. Wellhead has 4.5" casing, 2" tubing, and an electric pumping unit with rods. The valves are open. The tank battery contains a 210 bbl tank, 50 bbl poly brine tank, 2" sales meter with 3/8" orifice, chart, drip, and vertical seperator all within an earthen dike.
|
|
|
|
| 1294859869
|
2011-01-12
|
|
On site to witness testing of BOP driller pressured up on bladder and they applied 400 psi to drill string and we monitored pressure for 15 min with no decline in pressure.
Note: Instructed driller to replace 2" bull plug on choke system and properly chain down choke lines.
|
|
|
|
| 1408994271
|
2014-08-25
|
|
On the day of my inspection accompanied by ODNR Inspector Dylan Pendleton, I witnessed that the well was equipped with 4.5 inch casing, 2 inch tubing, rods and a pumping unit powered by electricity with valves in the open position. Production equipped a 210bbl tank, a 50bbl polymer brine tank, a vertical separator, a drip, a 2 inch sales meter with a .375 inch orifice and a chart recorder all within an earthen dike. Identification was present and production records are current.
|
|
|
|
| 2096771562
|
2011-01-10
|
|
On site to instruct site builder on proper pit construction and proper handling of top soil, Bowman Drilling moving in on site to drill new well.
|
|
|
|
| 810716968
|
2011-01-11
|
|
Drilling@470' should be setting 7" surface casing late tonight or early morning.
|
|
|
|