INSPECTION ID
|
DATE
|
DESCRIPTION
|
COMMENT
|
VIOLATION ID
|
VIOLATION CODE
|
VIOLATION_COMMENT
|
-948383729
|
2003-07-09
|
|
FOLLOW UP TO NOV # -406462255 The well was plugged and abandoned in December 2002. The tank battery is still present and needs to be removed. The flowline needs to be removed or waived. The salesline, driveway and gate are still used by Belden and Blake. Final restoration is past due
|
|
NONEA
|
|
-948383729
|
2003-07-09
|
|
FOLLOW UP TO NOV # -406462255 The well was plugged and abandoned in December 2002. The tank battery is still present and needs to be removed. The flowline needs to be removed or waived. The salesline, driveway and gate are still used by Belden and Blake. Final restoration is past due
|
|
NONEB
|
|
494314466
|
2004-08-06
|
|
Final restoration is approved
|
|
|
|
857073244
|
2002-12-11
|
|
Status check inspection - no violations at this time. Well scheduled to be plugged and abandoned soon.
|
|
|
|
98009088
|
2002-12-17
|
|
The well was plugged and abandoned on December 16, 2002. The job was not witnessed by MRM. The equipment, consisting of rods, tubing, 4-1/2" casing and wellhead connections remain on site. The pit has been closed and backfilled.
|
|
|
|
PL4377
|
|
|
Preliminary Restoration done information from Data Point
|
|
|
|