INSPECTION ID
|
DATE
|
DESCRIPTION
|
COMMENT
|
VIOLATION ID
|
VIOLATION CODE
|
VIOLATION_COMMENT
|
-1070022981
|
2013-09-09
|
|
Upon inspection, I found the well was shut in and it was no longer hooked up for annular disposal. The lines were disconnected from the wellhead and there was no motor on the pumpjack. There was a compressor and toolbox adjacent to the wellhead and when I talked with Andy he stated the well in bad shape and would not be able to pass a mechanical integrity test. There was a transfer tank adjacent to the wellhead where there was some minor contamination outside of the dike. Operator must clean up contamination outside of the dike and restore vegetative growth. Operator must make well capable of production within 60 days; or plugging is required in 60 days.
|
|
9-1-07
|
|
-1070022981
|
2013-09-09
|
|
Upon inspection, I found the well was shut in and it was no longer hooked up for annular disposal. The lines were disconnected from the wellhead and there was no motor on the pumpjack. There was a compressor and toolbox adjacent to the wellhead and when I talked with Andy he stated the well in bad shape and would not be able to pass a mechanical integrity test. There was a transfer tank adjacent to the wellhead where there was some minor contamination outside of the dike. Operator must clean up contamination outside of the dike and restore vegetative growth. Operator must make well capable of production within 60 days; or plugging is required in 60 days.
|
|
NONE E
|
|
-1070022981
|
2013-09-09
|
|
Upon inspection, I found the well was shut in and it was no longer hooked up for annular disposal. The lines were disconnected from the wellhead and there was no motor on the pumpjack. There was a compressor and toolbox adjacent to the wellhead and when I talked with Andy he stated the well in bad shape and would not be able to pass a mechanical integrity test. There was a transfer tank adjacent to the wellhead where there was some minor contamination outside of the dike. Operator must clean up contamination outside of the dike and restore vegetative growth. Operator must make well capable of production within 60 days; or plugging is required in 60 days.
|
|
NONE14
|
|
-1957424080
|
2003-02-21
|
|
2/20/03 could not test(need more nitrogen)
2/21/03 WAS ABLE TO GET WELL UP TO TEST PRESSURE 700 PSI
MIT test passed
|
|
|
|
-358828667
|
2013-12-09
|
|
Compliance Action Follow-up -1070022981: The tank up by the AD well has been removed and is now at the top of the access road. The well is still idle and Rusty Hutson stated they are most likely going to apply for a plugging permit. The ground is too wet for any restoration at this time, so I will continue to monitor their progress.
|
|
|
|
-404720310
|
2003-02-02
|
|
WITH DAVE BALL; M.I.T, DAN JONES, UNABLE TO BRING WELL UP TO TEST PRESSURE. 695# NEEDED, 550# SHOWN ON ANNULUS. TO LOAD W/ NITROGEN AND RETEST AT LATER DATE.
|
|
|
|
1156600414
|
2006-08-25
|
|
A.D. in use well was pumping on the day of my inspection,no violations noted.
|
|
|
|
1213916755
|
2008-06-17
|
|
On site to witness MIT test,upon arrival to site installed gauge on annulus of casing monitored pressure for 1 hr(698 psi) no decline in pressure test passed,after unhooking gauge instructed well tender to bleed pressure off of annnulas slow and after releasing pressure install new fittings on wellhead in preparation for the next test .
|
|
|
|
1827812031
|
2014-04-07
|
|
Compliance Action Follow-up -1070022981: The pumpjack has been removed from the well location. The well is currently shut in and Andy Corp stated that once he gets caught up on the other issues in the area he plans on trying to get well into commercial gas production.
|
|
|
|