-1773101750
|
2005-12-01
|
|
Conversation with Nancy Melville concerning outstanding NOV she stated that she had service rig scheduled for first part of Feb and requested that we extend compliance date.
|
|
|
|
1132498315
|
2005-11-18
|
|
Anonymous complaint called in for idle well,inspection revealed that well was idle and no I.D. posted after researching production records found that well has not been produced since 1996.Well is equipped with 4.5 casing with 4x2 swedge on it all valves are closed tank pad is equipped with separator and 1-100 bbl tank that will need dike constructed around it when SPCC rules go into effect if placed back into production.
|
|
9-9-05(A)10
|
|
1132498315
|
2005-11-18
|
|
Anonymous complaint called in for idle well,inspection revealed that well was idle and no I.D. posted after researching production records found that well has not been produced since 1996.Well is equipped with 4.5 casing with 4x2 swedge on it all valves are closed tank pad is equipped with separator and 1-100 bbl tank that will need dike constructed around it when SPCC rules go into effect if placed back into production.
|
|
NONE
|
|
1140042046
|
2006-02-13
|
|
|
9-9-05(A)10
|
|
1140042046
|
2006-02-13
|
|
|
NONE
|
|
1171150484
|
2007-02-09
|
|
Well has been properly plugged resolving previous NOV and Chief's Order.
|
|
9-9-05(A)10
|
|
1171150484
|
2007-02-09
|
|
Well has been properly plugged resolving previous NOV and Chief's Order.
|
|
NONE
|
|
180437808
|
2007-12-31
|
|
Final restoration work at site satisfactory,pit has been filled in and site restored.
|
|
|
|
PL9565
|
|
|
Preliminary Restoration done information from Data Point
|
|
|
|