34-151-25687

Well Details

Well ID: 34-151-25687
County:
Municipality:
Operator Name:
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date:
Unconventional:
Horizontal:
Producing:
Violations:
Latitude:
Longitude:

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
-1319098263 2010-07-07 Drilling directional at 2160'. I met with Sean Speedy on the location. The drilling pits and liners are intact.
-1860465339 2010-07-02 Drilling on mud at 460'. The drilling rig did not set enough conductor casing. There was more sand and gravel below 124'.
-2041138988 2010-07-03 Cemented surface casing. Pits and liners are intact.
-888605163 2010-06-29 Silt fencing has been placed along the west side of the drilling location.
1278431999 2010-07-01 Cemented conductor casing. Pits and liners are intact.
1278620424 2010-07-06 Dusting at 860'. The drilling pits and liners are intact.
1279299748 2010-07-16 The drilling pits are being solidified today.
1284083763 2010-09-08 The well is in production and the reclamation is completed at the site. The wellhead, tank battery, and gas meter run are fenced. The Preliminary Restoration is PASSED.
2048353016 2010-07-13 The drilling rig moved off the location on 7-12-2010. The location is rough graded and the drilling pits and liners are intact. I met with Brian Burrows (Campbell Oil) on the location and discussed the well.
330128771 2010-07-09 Drilling at 3730'. Drilling pits and liners are intact.
642919273 2010-07-10 T.D. at 4467'. Advent Drilling ran 106 joints of 4-1/2 dia casing; 10.5#, New; 4455' set at 4465' (KB). Universal cemented with 150 sacks of 50/50 Pozmix with 10% salt and 2% gel. Good circulation was maintained throughout the cement job.