2010-07-07
|
|
Drilling directional at 2160'. I met with Sean Speedy on the location. The drilling pits and liners are intact.
|
|
|
|
-1860465339
|
2010-07-02
|
|
Drilling on mud at 460'. The drilling rig did not set enough conductor casing. There was more sand and gravel below 124'.
|
|
|
|
-2041138988
|
2010-07-03
|
|
Cemented surface casing. Pits and liners are intact.
|
|
|
|
-888605163
|
2010-06-29
|
|
Silt fencing has been placed along the west side of the drilling location.
|
|
|
|
1278431999
|
2010-07-01
|
|
Cemented conductor casing. Pits and liners are intact.
|
|
|
|
1278620424
|
2010-07-06
|
|
Dusting at 860'. The drilling pits and liners are intact.
|
|
|
|
1279299748
|
2010-07-16
|
|
The drilling pits are being solidified today.
|
|
|
|
1284083763
|
2010-09-08
|
|
The well is in production and the reclamation is completed at the site. The wellhead, tank battery, and gas meter run are fenced. The Preliminary Restoration is PASSED.
|
|
|
|
2048353016
|
2010-07-13
|
|
The drilling rig moved off the location on 7-12-2010. The location is rough graded and the drilling pits and liners are intact. I met with Brian Burrows (Campbell Oil) on the location and discussed the well.
|
|
|
|
330128771
|
2010-07-09
|
|
Drilling at 3730'. Drilling pits and liners are intact.
|
|
|
|
642919273
|
2010-07-10
|
|
T.D. at 4467'. Advent Drilling ran 106 joints of 4-1/2 dia casing; 10.5#, New; 4455' set at 4465' (KB). Universal cemented with 150 sacks of 50/50 Pozmix with 10% salt and 2% gel. Good circulation was maintained throughout the cement job.
|
|
|
|