INSPECTION ID
|
DATE
|
DESCRIPTION
|
COMMENT
|
VIOLATION ID
|
VIOLATION CODE
|
VIOLATION_COMMENT
|
-1182853735
|
2012-05-17
|
|
Spoke with Mr. Jim Kilbarger in person about the Final restoration for this well and several others. He stated that he planned on completing them the following week (the week of May 27 2012).
|
|
|
|
-1436928245
|
2013-11-26
|
|
Compliance notice follow up. The site has vegetative cover. This satisfies the compliance notice.
|
|
|
|
-238014057
|
2012-06-06
|
|
Area has been re-graded. Seed and straw have been applied. Will do follow-up when vegetation has been established.
|
|
|
|
-342415515
|
2014-05-15
|
|
Upon inspection, it was observed that the former well location is graded and fully stabilized with a vegetative cover. The lease road is restored and production equipment has been removed from the location. This satisfies the requirements of the compliance notice and also for the final restoration of this site.
|
|
|
|
-721282556
|
2012-05-02
|
|
FOLLOW UP TO NOV # -991064332 Vegetation has not been established on this site. Pieces of pit liner have made it to the surface. Site has been graded. Seed and mulch need to be applied. Pieces of pit liner that are above ground need cut and any other pieces of trash need disposed of.
|
|
|
|
-991064332
|
2012-05-02
|
|
Vegetation has not been established on this site. Pieces of pit liner have made it to the surface. Site has been graded. Seed and mulch need to be applied. Pieces of pit liner that are above ground need cut and any other pieces of trash need disposed of.
|
|
NONE3
|
|
-991064332
|
2012-05-02
|
|
Vegetation has not been established on this site. Pieces of pit liner have made it to the surface. Site has been graded. Seed and mulch need to be applied. Pieces of pit liner that are above ground need cut and any other pieces of trash need disposed of.
|
|
NONEB
|
|
1316641500
|
2011-09-14
|
|
Berea plug was tagged at 708'. Witnessed ripping of 4.5" casing and setting of Bottom of Surface plug, and Surface plug.
|
|
|
|
1317041478
|
2011-09-12
|
|
Met with Mike McPete and Dave White of Kilbarger's along with Josh Garland, Andy Thomas and Pat Shreve to discuss better plugging methods when rig crew runs into a problem.
|
|
|
|
1348407825
|
2011-09-12
|
|
Met with A. Thomas, P. Shreve, and D. Goins at Kilbargers shop to discuss cement job.
|
|
|
|
1488108735
|
2011-09-12
|
|
Witnessed logging of well bore.
|
|
|
|
2050061054
|
2011-09-09
|
|
Witnessed bottom hole plug, Lime plug, and Berea plug on Clinton well. Spotted bottom hole plug through tubing. Bond log run and discovered hole had caved in all the way up to the bottom of the surface casing. Perfed and squeezed Lime plug and Berea plug at 2160 and 948. Shut down after the Berea plug was set.
|
|
|
|
2122763504
|
2011-09-12
|
|
I met with Kilbarger, at their office, to discuss plugging procedures on this well.
|
|
|
|
507501201
|
2004-08-25
|
|
No violations. NEW LAT & LONG
|
|
|
|
635447982
|
2011-09-13
|
|
Witnessed plugging operations. Crew tried to achieve circulation through 4.5" casing to set Berea plug. Circulation was achieved too quickly, and tubing had to be ran to set Berea plug through perforations. When pumping cement, circulation was achieved on the backside of the 4.5" casing. After plug was pumped, crew pulled tubing then shut down so that plug could be tagged the next day.
|
|
|
|