INSPECTION ID
|
DATE
|
DESCRIPTION
|
COMMENT
|
VIOLATION ID
|
VIOLATION CODE
|
VIOLATION_COMMENT
|
-1507346232
|
2014-02-13
|
|
This inspection is a follow up to compliance notice inspection # 1371147089. My inspection found no changes to the well since my last inspection. The well is not in production. I have received a plugging permit from Enervest for this well. I spoke to the company and the well is scheduled to be plugged.
|
|
|
|
-403150378
|
2014-07-08
|
|
|
|
|
-570947519
|
2011-11-04
|
|
Well is a rabbit well and is shut in at this time. E-mail sent to the operator requesting status of the well.
|
|
|
|
1371147089
|
2013-05-07
|
|
My inspection found the well to be equipped with a plunger lift unit. The annulus valve is closed. The well and tank battery are surrounded by a locked chain link fence. The tank battery consists of a 210 BBL production tank, a 100 BBL brine tank, and a mechanical separator. The identification sign needs updated. The well has not shown production since 2008. The valves on the wellhead are shut in. The well tender for Enervest Charlie, told me the flow line has a hole in it. Notification was sent to Mr McDaniel about the notice. Well must be produced within 90 days or plugged within 180 days of this notice.
|
|
NONE
|
|
2114330771
|
2013-05-07
|
|
My inspection found the well to be equipped with a plunger lift unit. The annulus valve is closed. The well and tank battery are surrounded by a locked chain link fence. The tank battery consists of a 210 BBL production tank, a 100 BBL brine tank, and a mechanical separator. The identification sign needs updated. The well has not shown production since 2008. The valves on the wellhead are shut in. The well tender for Enervest Charlie, told me the flow line has a hole in it. He said he would have his supervisor Mr McDaniels call me about the plans for the well.
|
|
|
|