34-019-21975

Well Details

Well ID: 34-019-21975
County:
Municipality:
Operator Name:
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date:
Unconventional:
Horizontal:
Producing:
Violations:
Latitude:
Longitude:

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
-1226555381 2007-05-21 Inspection revealed that the location has been graded . There are trees and tree stumps that need removed from the wellsite. The location also needs to be seeded to establish vegetation. No violations at this time.
-1455467017 2012-06-01 My inspection found a Preliminary Restoration is due for this well. The Preliminary Restoration can be passed. The pumping unit has been removed and the well converted to a swab well. The well has reported production of 173 (MCF) thousand cubic feet of gas for 2011 and no violations are noted at the well head or tank battery at this time.
-1495423602 2006-05-16 Inspection revealed that Robexco is building location ; no violations at this time.
-33611615 2006-10-26 On site to check the status of the fence around the drilling pits . The fence is intact and goes completely around the drilling pits . No violations at this time .
-344212743 2006-05-18 Inspection revealed that Robexco is building location and working on the lease road . No violations at this time.
1089671636 2006-07-24 Inspection revealed that Capstar Drlg is finishing the well . No violations at this time .
1180272803 2006-05-10 Inspection revealed that a dozer is sitting at the lease road entrance and it appears that they are getting ready to start cutting trees/brush and ready to start building the lease road. I talked with Jon Eick (Robexco) earlier this week and he advised that they should be starting the location either Wednesday or Thursday this week . No violations at this time.
159178191 2006-05-22 Inspection revealed that the equipment has been removed from location and nobody is on site . Capstar Drilling was suppose to be moving onto location today. I went to Robexco's office and Paul Robertson advised that Belden & Blake advised him that they weren't going to finish the location until the ground dried out .
1905836183 2006-08-22 Inspection revealed that the drilling pits are closed and location partially rough graded . No violations at this time .
1937260797 2006-06-14 Inspection revealed that Robexco is still building the location . They quit building the location for awhile because of all the rainfall .