-1568411679
|
2008-09-11
|
|
Meets requirements for Primary restoration.
|
|
|
|
-1702788094
|
2008-05-13
|
|
Pits being pumped off today and ready to close.
|
|
|
|
-1744913161
|
2008-09-11
|
|
Meets requirements for Primary restoration.
|
|
|
|
-1788772375
|
2008-11-12
|
|
Meets requirements for Primary restoration.
|
|
|
|
1395398821
|
2008-11-19
|
|
Meets requirements for Primary restoration.
|
|
|
|
232725723
|
2008-04-28
|
|
Ken Oil is running 4 inch casing on this well and rig should be moving Tuesday.
|
|
|
|
272717349
|
2008-04-25
|
|
Capstar dropped 8 inch casing while going in hole ,ran inside with steel die and ran more 8 inch and ended up cutting perf holes in section which was to be attached.Then circulated cement to surface.
|
|
|
|
292488470
|
2008-04-24
|
|
Capstar Drilling set 478 ft 8 5/8 casing c/w 230 sks Petroset -,Mark
|
|
|
|
669345736
|
2009-04-07
|
|
Meets requirements for Primary Restoration
|
|
|
|