INSPECTION ID
|
DATE
|
DESCRIPTION
|
COMMENT
|
VIOLATION ID
|
VIOLATION CODE
|
VIOLATION_COMMENT
|
-1569428455
|
2008-01-24
|
|
An inspection of the well revealed no ID at the well or tank battery, tanks do not meet tank spacing requirements, less then 3'ft apart, dike need rebuilt around tank battery.
|
|
9-9-05(A)10
|
|
-1569428455
|
2008-01-24
|
|
An inspection of the well revealed no ID at the well or tank battery, tanks do not meet tank spacing requirements, less then 3'ft apart, dike need rebuilt around tank battery.
|
|
9-9-05(A)2
|
|
-1569428455
|
2008-01-24
|
|
An inspection of the well revealed no ID at the well or tank battery, tanks do not meet tank spacing requirements, less then 3'ft apart, dike need rebuilt around tank battery.
|
|
9-9-05(A)9
|
|
-850866126
|
2008-03-21
|
|
In-Compliance.
|
|
|
|