If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-059-24271 |
| County: |
| Municipality: |
| Operator Name: |
| Well Pad ID: |
| Farm/Lease Name: |
| First Permit Date: |
| Last Permit Date: |
| Spud Date: |
| Unconventional: |
| Horizontal: |
| Producing: |
| Violations: |
| Latitude: |
| Longitude: |
| PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
|---|
| PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
|---|
| INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
|---|---|---|---|---|---|---|
| 10768846 | 2014-08-07 | On the day of my inspection I witnessed that the production equipment included 2-100bbl tanks, a 30bbl brine tank, a vertical separator, a drip and a 1.5 inch Honeywell rotary meter with a chart recorder all within an earthen dike. The well was equipped with 7 inch casing, 4.5 inch casing, 2.375 inch tubing, rods and a pumping unit powered by natural gas with valves in the closed position at the wellhead. Well identification was present and the site passed preliminary restoration according ORC 1509.072A. | ||||
| 1369945039 | 2013-05-30 | On the day of my inspection I witnessed four barrel of cement returns on the 9.625" casing, the pit was constructed and the liner was in place from the pit to the well head. | ||||
| 1370028635 | 2013-05-31 | On the day of my inspection I witnessed the rig crew for G & L Drilling running new seven inch surface casing in the well bore, Formation Cementing was on location waiting to cement. |