INSPECTION ID
|
DATE
|
DESCRIPTION
|
COMMENT
|
VIOLATION ID
|
VIOLATION CODE
|
VIOLATION_COMMENT
|
-1750475853
|
2013-04-23
|
|
On the day of my inspection the well was capable of production. No violations noted.
|
|
|
|
-1927964426
|
2012-05-15
|
|
On the day of my inspection the well was producing. No violations were noted.
|
|
|
|
-761158266
|
2012-10-16
|
|
On the day of my inspection the well site was restored in accordance with the preliminary restoration requirements. Preliminary restoration is now passed.
|
|
|
|
1320065544
|
2011-10-30
|
|
I received call from Randy giving 24 hour notice that the rig will be spudding around midnight tomorrow (10/31/2011).
|
|
|
|
1348697546
|
2012-09-25
|
|
Inspection revealed that well is shut in at present time ,company is trying to decide if they need to set gas compressor at site so they can get well into nearby high pressure sales line.
|
|
|
|
259229170
|
2012-02-27
|
|
On the day of my inspection I met with Don Kreagor regarding the dust incident. Dust was a result of pit solidification activity. No violations noted. (refer to complaint # 3617)
|
|
|
|