X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-155-21438

Well Details

Well ID: 34-155-21438
County:
Municipality:
Operator Name:
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date:
Unconventional:
Horizontal:
Producing:
Violations:
Latitude:
Longitude:

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
-1191951268 2013-05-14 My inspection of the well and surface facility found a truck without an Underground Injection Control number. The truck was owned and operated by Liquid Luggers. Dave Jenkins was notified. The truck driver was instructed to wait on location, until the truck was properly labeled.
-145081195 2012-10-16 My inspection of the injection facility and well found no violations. The pump was operating, while the pressures were gauged.
-1463080583 2012-06-19 My inspection of the well and facility found no violations.
-1472625338 2013-04-04 My inspection of the injection facility and well found no violations. The pump was operating at the time pressures were gauged.
-158305718 2014-06-13 The well was found operating over the maximum allowable injection pressure. Matt Kleese was notified in person. The pump rate was slowed, lowering the injection pressure. 9-3-07(D)
-1696987330 2013-01-09 My inspection of the injection facility and well found no violations.
-188703593 2011-08-18 The owner has applied to convert the well to a saltwater injection well. The well site was inspected as part of a field review. There are no water wells or bodies of water within close proximity to the proposed location of surface facilities. The inspe
-1894502968 2012-07-03 My inspection of the well site found no violations at the time.
-2132087981 2012-07-20 My inspection of the well site and injection facility found no violations.
-669971554 2012-12-05 My inspection of the injection facility found no violations. I took a water sample from a brine hauler. The sample was sent to the Cambridge Lab for analysis.
1300289555 2013-05-14 I completed a salt water injection well inspection with ODNR Inspector Steve Ochs. My inspection found the tubing had 1130 psi and the 4.5" had 0 psi. The injection facility was in good operating condition with no water or oil surrounding the diked tanks.
1318336643 2011-10-11 Parmaco tension packer installation was witnessed.
1318429191 2011-10-12 Fresh water, with corrosion inhibitor, was pumped into the tubing/casing annulus. A Parmaco tension packer was set. The well failed to pass the Mechanical Integrity Test.
1320080398 2011-10-31 Contractor attempted to set the packer.
1404816190 2011-10-31 A mechanical integrity test was performed on this well and 1180 PSI was placed on the tubing/casing annulus. There was a decline in pressure of approximately 5 PSI observed during the 15 minute test period.
1496083948 2012-09-04
169837762 2012-02-01 A trench was dug to tie the oil tank containment dike into the drainage system.
171751610 2011-10-03 An injection test was performed on this well. Approximately 400 barrels of fluid were pumped in 1 hour and 3 minutes. The average rate was 6.35 barrels per minute. The maximum pressure was 875 PSI. The pressure at the conclusion of the test was 600 PSI. The pressure was at 525 PSI, 5 minutes after shutdown.
329206871 2012-03-12 My inspection of this site found the dike wall was being constructed. There were no violations noted at the time of inspection.
517272107 2013-08-20 There were no violations at the time of inspection.
556276720 2014-03-17 My inspection of the well found no violations at the time.
562822320 2012-08-14 My inspection of the well site and injection facility found no violations.
59604026 2013-10-10 No violations were found at the time of inspection.
707560555 2011-10-19 A Mechanical Integrity Test was performed. The test failed.
748827000 2012-01-10 The pad was being poured for the tank battery. All conditions were acceptable.
803709669 2012-06-06 My inspection of this well site found no violations at the time.
959693422 2011-10-26 A mechanical integrity test was performed on this well and 1235 PSI was put on the tubing/casing annulus. There was a decline in pressure of approximately 5 PSI observed during the 15 minute test period.