INSPECTION ID
|
DATE
|
DESCRIPTION
|
COMMENT
|
VIOLATION ID
|
VIOLATION CODE
|
VIOLATION_COMMENT
|
-525773481
|
2013-03-08
|
|
Well is still not capable of working but identification violation has been satisfied. Pollution and Contamination has been cleaned up and removed. The tanks are now spaced and diked.
|
|
|
|
-589708529
|
2006-08-24
|
|
Well may be producing.
|
|
|
|
-79236592
|
2014-03-26
|
|
I met with Tom Fishetto of Bancequity on 3-26-14 and gave him a list of the outstanding violations I had with the company to date. He said he would work on getting resolved and that he would start with the Wilson farm on the Luke Imlay.
|
|
|
|
1385048443
|
2013-11-06
|
|
Idle well still because of no electric hook up. Pumping unit and well are hooked up now. I called company and told Tom Fishetto and Tracey Lindemood to get well hooked up to resolve the Compliance Notice.
|
|
|
|
1618597497
|
2013-02-20
|
|
Well is idle by no means of electric power and pumping unit is broken. Well is shut in. There is no identification at well head. There are two 100 barrel tanks by State Route 376 and they ran over. The leak caused oil to run down over the tanks and make a contaminated spot. The spot is approximately 20x20. The company placed wood pete on the area. From when the company obtained ownership of the well there is a gap of production from 2005-2011. Place tanks 36appart and cleanup and remove contaminated soil. Tanks will be diked up to 110 percent of the capacity of the combinded tanks.Plug or produce well. Place id at well head and at tanks. Failure to comply may result in Bond Forfeiture. The company has 10 days on the tank clean up and 30 days on the well to get in compliance.
|
|
9-1-07
|
|
1618597497
|
2013-02-20
|
|
Well is idle by no means of electric power and pumping unit is broken. Well is shut in. There is no identification at well head. There are two 100 barrel tanks by State Route 376 and they ran over. The leak caused oil to run down over the tanks and make a contaminated spot. The spot is approximately 20x20. The company placed wood pete on the area. From when the company obtained ownership of the well there is a gap of production from 2005-2011. Place tanks 36appart and cleanup and remove contaminated soil. Tanks will be diked up to 110 percent of the capacity of the combinded tanks.Plug or produce well. Place id at well head and at tanks. Failure to comply may result in Bond Forfeiture. The company has 10 days on the tank clean up and 30 days on the well to get in compliance.
|
|
9-9-05(A)10
|
|
1618597497
|
2013-02-20
|
|
Well is idle by no means of electric power and pumping unit is broken. Well is shut in. There is no identification at well head. There are two 100 barrel tanks by State Route 376 and they ran over. The leak caused oil to run down over the tanks and make a contaminated spot. The spot is approximately 20x20. The company placed wood pete on the area. From when the company obtained ownership of the well there is a gap of production from 2005-2011. Place tanks 36appart and cleanup and remove contaminated soil. Tanks will be diked up to 110 percent of the capacity of the combinded tanks.Plug or produce well. Place id at well head and at tanks. Failure to comply may result in Bond Forfeiture. The company has 10 days on the tank clean up and 30 days on the well to get in compliance.
|
|
9-9-05(A)2
|
|
1618597497
|
2013-02-20
|
|
Well is idle by no means of electric power and pumping unit is broken. Well is shut in. There is no identification at well head. There are two 100 barrel tanks by State Route 376 and they ran over. The leak caused oil to run down over the tanks and make a contaminated spot. The spot is approximately 20x20. The company placed wood pete on the area. From when the company obtained ownership of the well there is a gap of production from 2005-2011. Place tanks 36appart and cleanup and remove contaminated soil. Tanks will be diked up to 110 percent of the capacity of the combinded tanks.Plug or produce well. Place id at well head and at tanks. Failure to comply may result in Bond Forfeiture. The company has 10 days on the tank clean up and 30 days on the well to get in compliance.
|
|
9-9-05(A)9
|
|
1618597497
|
2013-02-20
|
|
Well is idle by no means of electric power and pumping unit is broken. Well is shut in. There is no identification at well head. There are two 100 barrel tanks by State Route 376 and they ran over. The leak caused oil to run down over the tanks and make a contaminated spot. The spot is approximately 20x20. The company placed wood pete on the area. From when the company obtained ownership of the well there is a gap of production from 2005-2011. Place tanks 36appart and cleanup and remove contaminated soil. Tanks will be diked up to 110 percent of the capacity of the combinded tanks.Plug or produce well. Place id at well head and at tanks. Failure to comply may result in Bond Forfeiture. The company has 10 days on the tank clean up and 30 days on the well to get in compliance.
|
|
NONE_
|
|
1618597497
|
2013-02-20
|
|
Well is idle by no means of electric power and pumping unit is broken. Well is shut in. There is no identification at well head. There are two 100 barrel tanks by State Route 376 and they ran over. The leak caused oil to run down over the tanks and make a contaminated spot. The spot is approximately 20x20. The company placed wood pete on the area. From when the company obtained ownership of the well there is a gap of production from 2005-2011. Place tanks 36appart and cleanup and remove contaminated soil. Tanks will be diked up to 110 percent of the capacity of the combinded tanks.Plug or produce well. Place id at well head and at tanks. Failure to comply may result in Bond Forfeiture. The company has 10 days on the tank clean up and 30 days on the well to get in compliance.
|
|
NONEC
|
|
410760412
|
2003-06-17
|
|
|
|
|