INSPECTION ID
|
DATE
|
DESCRIPTION
|
COMMENT
|
VIOLATION ID
|
VIOLATION CODE
|
VIOLATION_COMMENT
|
-1086050813
|
2010-04-10
|
|
cemented conductor.
|
|
|
|
-1366610896
|
2010-04-17
|
|
3611 feet of production casing was installed and cemented.
|
|
|
|
-1450037862
|
2012-03-06
|
|
No violations found, well is in compliance.
|
|
|
|
-1844262776
|
2010-04-11
|
|
surface cementing good returns to surface.
|
|
|
|
-458768987
|
2010-04-11
|
|
On site for BOP test. Closed BOP at 350psi, pressured hole to 190psi, test was for 15 minutes, 10psi pressure lose during test, 5.2% lose of pressure BOP passed. Pits and linear were in good repair. Safety fence was up. Permit was posted in the dog house. Two fire extinguishers in the dog house (charged), one on the boom (not inspected), one on the mud pump (charged) and one by the engine on the rig (charged). Site was in good repair.
|
|
|
|
-875953674
|
2010-04-12
|
|
Drilling at 1120' No odors present checked with gas meter no readings
No violation.
|
|
|
|
1682073566
|
2010-03-29
|
|
Held on site meeting to discuss the on site construction and permitn conditions.
|
|
|
|
1786623495
|
2010-04-11
|
|
cemented conductor casing.
|
|
|
|
1955290958
|
2010-03-29
|
|
Held presite meeting to discuss permit conditions for the well.
|
|
|
|
1958162413
|
2010-04-27
|
|
meeting at Uniontown office to review bond log because cement not covering lockport by 100' meeting determined not gas encountered in newburg zone. Rick Simmer Oked company to proceed with stimulation of well.
|
|
|
|
2083899026
|
2013-07-24
|
|
The producing unit consists of a wellhead with mechanical plunger-lift unit and above-ground storage tank (AST) battery, The wellhead is located in a board-on-board enclosure which is locked. The well is currently producing. There is not ID at the wellhead. I did not observe any signs of leakage or problems. The AST battery is comprised of one 140-barrel production tank, one 50-barrel brine tank, and mechanical separator in a board-on-board enclosure. There is a unit ID at the wellhead. Secondary containment is good.
|
|
|
|
2132032583
|
2010-06-01
|
|
Ground leveled around well siteand an temporary fencing (chain link) up around well.
|
|
|
|
818618918
|
2011-12-28
|
|
On 12/28/2012, DNR Inspector Richard Skidmore completed an urban preliminary restoration well inspection for DNR Inspector Ray Wallace. The lease road, tank battery, and well head locations are in compliance with 1501:9-9-05. Inspection passed.
|
|
|
|