-1964190452
|
2003-07-24
|
|
found tank battery not well ;one 210 BBL ,seperator,EOG Drip tank, meter box. Adminative violation bonding.
|
|
NONE
|
|
1067001569
|
2003-10-24
|
|
no violation in fieild Bonding violation columbus office.
|
|
9-9-05(A)10
|
|
2068250097
|
2012-12-17
|
|
The unit is comprised of a one-tank battery (1 210-barrel) and a wellhead with mechanical plunger lift, and mechanical separator, which is not enclosed. The well is currently in production. The tank and well spacing is in accordance with 1509:9-9-05 . The loadouts need locked. Unit identification is present and legible at the tank battery. There is no secondary containment at the tank battery. I did not observe any leaks, spills, or other signs of contamination. I called Tim Reilly and advised him about the need for loadout locks and a dike.
|
|
9-05E3
|
|
2068250097
|
2012-12-17
|
|
The unit is comprised of a one-tank battery (1 210-barrel) and a wellhead with mechanical plunger lift, and mechanical separator, which is not enclosed. The well is currently in production. The tank and well spacing is in accordance with 1509:9-9-05 . The loadouts need locked. Unit identification is present and legible at the tank battery. There is no secondary containment at the tank battery. I did not observe any leaks, spills, or other signs of contamination. I called Tim Reilly and advised him about the need for loadout locks and a dike.
|
|
9-9-05(A)9
|
|