INSPECTION ID
|
DATE
|
DESCRIPTION
|
COMMENT
|
VIOLATION ID
|
VIOLATION CODE
|
VIOLATION_COMMENT
|
-1484075397
|
2014-08-13
|
|
Drilling ahead at 200'. Only making 2' per run as the shale is slabbing up on the bit and trying to stick .
|
|
|
|
-2005095774
|
2014-08-08
|
|
Drove 38' of 10-3/4" drive pipe. Driving pipe.
|
|
|
|
-818115894
|
2014-08-26
|
|
Cemenco cemented the 350' of 7" 24# casing with 110 sacks of Class A cement. See the casing ticket for the details.
|
|
|
|
1409173247
|
2014-08-26
|
|
The operator requested an inspection to witness surface casing cement. The county inspector was busy on another rig and requested assistance. The well circulated and cement returned to surface. Todd Miller is writing the casing report.
|
|
|
|
1409309508
|
2014-08-28
|
|
The surface cement dropped 25' and is still inside the drive pipe. They will top it off with sack cement. The rig is idle until next week.
|
|
|
|
1653942883
|
2014-08-18
|
|
Drilling ahead at 310'.
|
|
|
|
902082
|
2014-08-12
|
|
Seated drive pipe at 45'. Hit fresh water at 100'. Drilling ahead at 150'.
|
|
|
|