INSPECTION ID
|
DATE
|
DESCRIPTION
|
COMMENT
|
VIOLATION ID
|
VIOLATION CODE
|
VIOLATION_COMMENT
|
-1277125290
|
2011-05-06
|
|
|
|
|
-1674648509
|
2011-11-01
|
|
Inspection this day as followup to NOV written 6/10. Slope slip looks good. There has been some additional slippage since they repaired it (about a year ago) but not much movement. Well is in production, there is a current chart in meter, the dike is in good repair and there is no sign of illegal brine dumping. Proper identification (ID) must be posted at the tank battery. I e-mailed Christy and told her the ID must be posted before the violation can be resolved.
|
|
|
|
-1778619241
|
2010-08-10
|
|
Inspection found slip has been graded level, smoothed out and grass seeded and mulched. Water bars placed in lease road to stop erosion, edges of lease road have been seeded and mulched. Will wait for grass to grow, see if slip is fixed before resolving NOV.
|
|
|
|
-623379016
|
2010-06-01
|
|
Inspection this day found slip, as predicted when location was approved for PRD and reviewed with Brian Chavez. Slip is now 125' long and 4-6' deep, dropping on south end of location. Lease road into location also is eroding due to steepness and should be corrected. Will write NOV. 6/25/10 - Brian has talked with Soil and Water and they came out to give advise. They want to watch it thru the summer and have asked for an extension until 9/1/10 which is granted.
|
|
|
|
-85768943
|
2013-09-19
|
|
Inspection this day with Andy Thomas to see if reclamation has been completed, slip has stopped moving and is stablized. Very sparse vegetation but no topsoil saved when the location was built. Slip has stopped moving, lease road starting to erode but NOV can be solved.
|
|
|
|
101330293
|
2007-07-09
|
|
Inspection this day found the rig had moved off, location has been smoothed and pits filled. No evidence that they drained pits over the hill. Carl says he will complete these 2 Delph wells after their disposal well is completed, in the fall.
|
|
|
|
1244640507
|
2009-06-09
|
|
|
|
|
1595345042
|
2009-03-04
|
|
Request this day due to receipt of landowner waiver from Chief asking for approval. Supervisor Cheslock accompanied me and we agreed that reclamation was not satisfactory. The location is huge 200 x 300', possibly) with no visible grass growing. On down side of location, ground has spilled and will continue to unless contoured to a lesser degree, also location is eroding badly with cuts up to 2' deep on the downside - again nothing growing to hold it. Much more dozer work needed to contour slopes, could possibly add brim to edge of location, funneling water down to one side, lined with big rock. Location needs reseeded/mulched unless much more vegetative coverage grows this Spring. Dike needs regraded, built back up but does have good drain in it. ID's good at tank, well producing.
|
|
NONEC
|
|
326968819
|
2010-06-01
|
|
Repair slip - it is substantial. Lease road into location also needs corrective work. 1/6/11 - Talked to Carl and he says believes slip is holding but can wait until Spring to check.
|
|
NONEC
|
|