Well Details

Well ID: 34-051-20081
County:
Municipality:
Operator Name:
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date:
Unconventional:
Horizontal:
Producing:
Violations:
Latitude:
Longitude:

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
-76026519 2007-10-04 Stone access road provides access to site. Area where well was located will be agricutural production. All materials removed from site. Final restoration acceptable.
1093371707 2001-10-10 FOLLOW UP TO NOV # 113 Fulton Energy LTD its agents, assignees and successors, shall plug the well or put it into production by the specified date or further action may be taken. NONE
11373553 2001-10-15 Fulton Energy LTD its agents, assignees and successors, shall plug the well or put it into production by the specified date or further action may be taken.
1186496047 2007-08-01 Well was plugged by Team Services LLC from Michigan on 7/31/07. Inspector unable to witness plug. Checked well with Tim Tinker of Team Services LLC. Could not observe cement in pipe due to pit around well casing. Tim indicated that cement was near ground elevation. Completed plugging report with Tim.
277637188 2007-08-02 Checked well site with Tim Tinker. Well casing has been cut off below ground, ID plate attached to well, pit backfilled and area graded. The disturbed area was natural succession site next to farm field. An existing stone lane was on the site. Some of the stone was spread around the graded area. Suggested that Tim contact landowner to determine if additional stone is needed for access lane. Remaining disturbed areas around the site needs to be seeded with reclamation type seed mixture, including a fast growing annual grass.