INSPECTION ID
|
DATE
|
DESCRIPTION
|
COMMENT
|
VIOLATION ID
|
VIOLATION CODE
|
VIOLATION_COMMENT
|
-1388244202
|
2010-05-10
|
|
I performed a rig inspection on G & H rig #91. The drilling depth was 5671'. Drilling on air/soap. The rig and location were in compliance with 1501:9-9-03. There were no violations at this time.
|
|
|
|
-1670332037
|
2010-05-24
|
|
The workover rig is on the well. The circulating pit is empty. The blow pit is down 2 feet. The drilling rig is gone. The debris has been removed. This well has not passed preliminary restoration.
|
|
|
|
1046244371
|
2010-06-02
|
|
The drilling pits have been solidified and closed. This well has not passed preliminary restoration.
|
|
|
|
1106245407
|
2010-06-30
|
|
The top soil has been spread out around the drilling location. The ID sign was posted. The fence was not installed yet around the tank battery and the wellhead.
|
|
|
|
1273163790
|
2010-05-06
|
|
I performed a rig inspection on G & H rig #91. The rig was drilling on fluid to 500'. The kelly hose had a hole blown in it. Tripping out of the hole. The drilling pits took 2 days to jack hammer. A pad was installed between the liner and the rock. No visual leaks in the pit liners. There were no violations at this time.
|
|
|
|
1273495326
|
2010-05-07
|
|
I witnessed the cementing of the 8 5/8" casing. There were no violations at this time.
|
|
|
|
1916820781
|
2010-08-16
|
|
The fences have been installed around the tank battery and the wellhead. The ID sign was posted. This well PASSES PRELIMINARY RESTORATION.
|
|
|
|
2021444679
|
2010-05-07
|
|
I performed a rig inspection on G & H drilling rig #91. The ID sign was posted. The drilling pits were in compliance. There were no violations at this time.
|
|
|
|
2124435586
|
2010-05-11
|
|
I performed a rig inspection on G & H rig #91. The drilling depth was 5817'. The rig made a bit trip. Reaming the hole down to 5817'. Drilling on air/soap. The rig and location were in compliance with 1501:9-9-03. There were no violations at this time.
|
|
|
|
372052001
|
2010-05-25
|
|
I met with Todd Suckow, Kevin Hutchinson from BOCOR and Eric White the consultant on the drilling location. The well will be frac'd on 5/28/10.
|
|
|
|
47094108
|
2010-05-13
|
|
The drilling rig is gone. The fluid level inside both pits were 3 feet down from ground level. This well has not passed preliminary restoration.
|
|
|
|