If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-035-22069 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.4633255471,"lon":-81.5141938656,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2008-10-20 | |
Unconventional: | |
Horizontal: | |
Producing: No | |
Violations: 0 | |
Latitude: 41.4633255471 | |
Longitude: -81.5141938656 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
-1395017389 | 2009-04-22 | no violation at site | ||||
-1726633468 | 2008-10-21 | Conductor cementing | ||||
-1839922266 | 2014-06-19 | I inspected this producing unit as part of routine inspection activity. Production reports are current. I did not observe any signs or evidence of leakage, spill , or problems at either the production wellhead or tank battery system. The wellhead and battery are located within the asphalt-paved parking area behind the professional office building at 23360 Chagrin Blvd. The secondary containment at the battery which is comprised of 24" high masonry block, is in good condition. The process safety equipment is present. Tank hatch lids are closed. Load lines are bull-plugged and locked. Gates are intact and locked. Signage is present, accurate, and readable. The interior diked area is lined with sorted limestone gravel which is free from standing water or weeds. I observed no problems or issues requiring attention. | ||||
-1879241413 | 2009-01-23 | company working on well site and tank battery | ||||
-1930006662 | 2013-02-19 | The wellhead consists of a mechanical plunger lift unit in an 8-foot fenced enclosure. The 8 5/8-inch casing does not indicate any pressure at the gauge. The associated tank battery consists of 1 100-barrel (BBL) tank, 1 50 BBL tank. The mechanical separator is located in a separate, locked enclosure.. The spacing is in accordance with the rule. The tank battery dike is adequate. Safety gear in place as required by 1501:9-9-05. | ||||
-1973895958 | 2008-10-27 | running 4.5" | ||||
-2103360872 | 2008-11-03 | pits closed area leveled | ||||
-863077707 | 2008-10-22 | surface cementing | ||||
1580866577 | 2012-01-12 | On 01/12/2012, DNR Inspector Richard Skidmore completed an urban preliminary restoration well inspection for DNR Inspector Ray Wallace. The lease road, tank battery, and well head locations are in compliance with 1501:9-9-05. Inspection passed. | ||||
91664835 | 2008-12-01 | pits closed service rig on site |