34-105-23673

Well Details

Well ID: 34-105-23673
Loading map...
County:
Municipality:
Operator Name:
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2011-08-09
Unconventional:
Horizontal:
Producing: No
Violations: 2
Latitude: 39.1442404253
Longitude: -81.9225460806

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
-1175771062 2012-09-12 Failure to complete the initial restoration requirements as required under division (A) of section 1509.072 of the Revised Code. An area around the wellhead roughly 180' x 75' is void of vegetative cover. There is significant erosion to along the lease road as well as sediment entering a creek to the west of the lease road. Photos taken. The owner or the owner's agent shall grade or terrace and plant, seed, or sod the area disturbed that is not required in production of the well where necessary to bind the soil and prevent substantial erosion and sedimentation. Failure to comply with in the given time period will result in a material and substantial violation. NONE5
-1238225063 2012-10-11 Positive drainage has been restored along the side of the well site. The lease road has been smoothed out and water bars have been placed to divert drainage away from lease road. The entire are has been seeded and mulched. Straw bails have been placed to stop sedimentation in the creek. I will return on the due date to ensure vegetative growth has been established.
-1317595655 2012-10-05 Follow up to inspection -1175771062 on 9/12/12. No remediation has been done at the well site yet.
-1479783181 2011-10-03 Drilling status check. Reached a total depth of 1915' on Thursday September 29, 2011. Pulling out of hole now. Well to be logged this afternoon.
-1521754596 2011-09-07 Spoke with Tom Stone of Mountaineer State Drilling, Jeff Burke not currently drilling on Blackwood lease.
-229345069 2011-08-24 AD fresh water surface casing test. Tested at 380 psi for 15 minutes with no loss in pressure.
-234052666 2012-09-25 I met with Tom Stone of Mountaineer and the landowner, Jay Blackwood to discuss the restoration requirements and the erosion issues at the site.
-557455778 2012-09-27 Inspection #68934798 has been voided because violation was given verbally. A written violation is being issued to the company today.
-678389007 2012-10-31 Follow up to inspection -1175771062. Vegetative cover is returning. There is no erosion along the road and no sedimentation in the stream along side the lease road.
1030776120 2011-09-26 Drilling status check. Began drilling last Monday the 19th. Currently at 1515 feet.
1314624808 2011-08-29 Drilling inspection. Not drilling today, trouble with pump. Pit liner is in good condition with no rips or tears.
1316442700 2011-09-19 Drilling status check. Not currently drilling, but will commence drilling soon. Pit looks secure and liner intact.
1341520271 2012-07-05 The road has been graded. The well site still needs vegetative cover.
1347474281 2012-09-12 The landowner called about the erosion on his and his fathers property. This well is currently in violation for not having completed the Preliminary Restoration requirements. There is significant erosion to a bank along side the well site as well as sediment entering a creek to the west of the lease road. Photos taken.
68934798 2012-04-27 Area has not been graded and vegetative cover has not been established. Erosion has traveled down the road. Area shall be graded and vegetative cover shall be established in areas not essential to production order to prevent erosion. NONE5
879488038 2011-08-15 Witnessed surface casing cement job. 547 feet of 7 inch casing in 550 feet of 8.75 inch borehole. 105 sacks class A, 200lb gel, 300 lb accelerator, 120 lb LCM. Circulation established, good cement returns, cement level dropped 3-4 feet, topped off and level stayed at surface.
899514852 2012-01-27 The drilling pits have been filled in per the two month restoration requirements. The well is equipped with a pumping unit and an electric motor. The 4.5 production casing is hooked up for annular disposal. The tank battery is equipped with a 100 barrel storage tank and a separator. The drain in the dike is not equipped with a shut-off valve.