If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-155-21467 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.219413446,"lon":-80.5694864843,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 1980-10-30 | |
Unconventional: | |
Horizontal: | |
Producing: No | |
Violations: 2 | |
Latitude: 41.219413446 | |
Longitude: -80.5694864843 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
-159029089 | 2014-04-25 | I was on location to perform a status checking inspection. I found during my inspection that the well was not in production. The well was equipped with a plunger lift unit. The ball valve on the flow line at the well was closed. The tank battery consisted of a 100 barrel production tank and a separator. A dike surrounded the production tank. I noticed oil stained soil next to the production tank. The separator was positioned outside the dike. All production equipment spacing was in compliance. There was no identification sign posted. A bull plug was installed on the load line. There a 7 day production chart inside the separator dated 10/14 to 10/21 with no year. The lease road was in stable condition. I took photos of the production equipment and well. According to our database, Energy Exploration has reported zero annual production for 2012 and 2013. I called Energy Exploration & Development and left a message to return my call. John Ross of Energy Exploration returned my call on 5/2/2014. I told Energy Exploration that a compliance notice would be issue to file for a plugging permit within 90 days (8/1/2014) and to plug the well with 180 days (11/3/2014). John stated the landowner may be interested in owning the well. | 9-05E1 | |||
-159029089 | 2014-04-25 | I was on location to perform a status checking inspection. I found during my inspection that the well was not in production. The well was equipped with a plunger lift unit. The ball valve on the flow line at the well was closed. The tank battery consisted of a 100 barrel production tank and a separator. A dike surrounded the production tank. I noticed oil stained soil next to the production tank. The separator was positioned outside the dike. All production equipment spacing was in compliance. There was no identification sign posted. A bull plug was installed on the load line. There a 7 day production chart inside the separator dated 10/14 to 10/21 with no year. The lease road was in stable condition. I took photos of the production equipment and well. According to our database, Energy Exploration has reported zero annual production for 2012 and 2013. I called Energy Exploration & Development and left a message to return my call. John Ross of Energy Exploration returned my call on 5/2/2014. I told Energy Exploration that a compliance notice would be issue to file for a plugging permit within 90 days (8/1/2014) and to plug the well with 180 days (11/3/2014). John stated the landowner may be interested in owning the well. | NONE |