34-085-21060

Well Details

Well ID: 34-085-21060
Loading map...
County:
Municipality:
Operator Name:
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2003-11-07
Unconventional:
Horizontal:
Producing: No
Violations: 2
Latitude: 41.7022023984
Longitude: -81.2935967427

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
1985673941 2013-09-10 The producing unit consists of a wellhead with mechanical plunger lift system and aboveground storage tank battery. The battery, separator, and wellhead are in separate chain-link enclosures. The battery is comprised of 1 100-barrel fiber-reinforced plastic (FRP) production tank, 1 100-barrel steel brine tank, and separator unit. The spacing between the production tank and the separator is less than 10 feet and is not in compliances with the required 10 feet. The spacing between the battery tanks are less than three feet and are not in compliance. There is adequate secondary containment. Locks and signage are present. The locked gated entry to the access road also requires a sign. The corrections should be made within 90 days. 9-05E1
1985673941 2013-09-10 The producing unit consists of a wellhead with mechanical plunger lift system and aboveground storage tank battery. The battery, separator, and wellhead are in separate chain-link enclosures. The battery is comprised of 1 100-barrel fiber-reinforced plastic (FRP) production tank, 1 100-barrel steel brine tank, and separator unit. The spacing between the production tank and the separator is less than 10 feet and is not in compliances with the required 10 feet. The spacing between the battery tanks are less than three feet and are not in compliance. There is adequate secondary containment. Locks and signage are present. The locked gated entry to the access road also requires a sign. The corrections should be made within 90 days. 9-05E4