If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-085-21060 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.7022023984,"lon":-81.2935967427,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2003-11-07 | |
Unconventional: | |
Horizontal: | |
Producing: No | |
Violations: 2 | |
Latitude: 41.7022023984 | |
Longitude: -81.2935967427 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
1985673941 | 2013-09-10 | The producing unit consists of a wellhead with mechanical plunger lift system and aboveground storage tank battery. The battery, separator, and wellhead are in separate chain-link enclosures. The battery is comprised of 1 100-barrel fiber-reinforced plastic (FRP) production tank, 1 100-barrel steel brine tank, and separator unit. The spacing between the production tank and the separator is less than 10 feet and is not in compliances with the required 10 feet. The spacing between the battery tanks are less than three feet and are not in compliance. There is adequate secondary containment. Locks and signage are present. The locked gated entry to the access road also requires a sign. The corrections should be made within 90 days. | 9-05E1 | |||
1985673941 | 2013-09-10 | The producing unit consists of a wellhead with mechanical plunger lift system and aboveground storage tank battery. The battery, separator, and wellhead are in separate chain-link enclosures. The battery is comprised of 1 100-barrel fiber-reinforced plastic (FRP) production tank, 1 100-barrel steel brine tank, and separator unit. The spacing between the production tank and the separator is less than 10 feet and is not in compliances with the required 10 feet. The spacing between the battery tanks are less than three feet and are not in compliance. There is adequate secondary containment. Locks and signage are present. The locked gated entry to the access road also requires a sign. The corrections should be made within 90 days. | 9-05E4 |