Well Details

Well ID: 34-085-21241
Loading map...
County:
Municipality:
Operator Name:
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2007-10-04
Unconventional:
Horizontal:
Producing: No
Violations: 2
Latitude: 41.6500328954
Longitude: -81.2467158812

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
-1293156199 2012-12-05 The unit is comprised of a two-tank battery (1 210 and 1 140-barrel) and a wellhead with mechanical plunger lift, and mechanical separator, each in separate wood board-on-board enclosures. The well is currently in production. The tank and well spacing is in accordance with 1509:9-9-05 . Unit identification is present and legible at the tank battery. The tank battery secondary containment is adequate. I did not observe any leaks, spills, or other signs of contamination. The gates are locked.
-2035228879 2007-10-24 setting tank battery
-221871246 2007-10-19 well being fraced
-651225979 2007-10-04 surface
-860080482 2010-04-14 No violations were found at the time.
1312213949 2011-07-28 Dike, spacing, ID in compliance. Vent hatches are installed and closed. Feedlines are bullplugged. No locks on gates, lightning arrestor and charcoal not installed. 9-05E3
1312213949 2011-07-28 Dike, spacing, ID in compliance. Vent hatches are installed and closed. Feedlines are bullplugged. No locks on gates, lightning arrestor and charcoal not installed. 9-9-02
1313048185 2013-10-09 The producing unit consists of a wellhead and aboveground storage tank (AST) battery in separate board-on-board enclosures. The wellhead is a mechanical plunger lift. The battery is comprised of 1 210-barrel and 1 140-barrel steels tank and separator. Secondary containment, spacing, and signage is good. Process safety equipment (spark arrestor, carbon filter, and low-pressure relief valve) are present. Gates are locked. The ID placard is located on the inside of the battery and not visible. I will contact John D. Oil about moving the placard to the outside. No problems otherwise noted.
2079209791 2007-09-25 location made ready for rig.
263410894 2008-10-14