34-153-21278

Well Details

Well ID: 34-153-21278
Loading map...
County:
Municipality:
Operator Name:
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 1983-02-23
Unconventional:
Horizontal:
Producing: No
Violations: 10
Latitude: 41.3312361342
Longitude: -81.5622362786

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
-2015894714 2003-11-26 The final restoration issues are still pending. The tank battery must be dismantled, the flowline/salesline waived or removed and the well site restored. The pipeline system is being sold to D&D Energy. NONEA
-2015894714 2003-11-26 The final restoration issues are still pending. The tank battery must be dismantled, the flowline/salesline waived or removed and the well site restored. The pipeline system is being sold to D&D Energy. NONEB
-958218511 2005-03-31 Bob Ditty has started tearing the tank battery apart and will be reclaiming the site.
1414002009 2004-10-22 Final restoration is long past due. No change has occurred since the NOV was issued. NONEA
1414002009 2004-10-22 Final restoration is long past due. No change has occurred since the NOV was issued. NONEB
1648191808 2003-09-24 The final restoration issues are still pending. The tank battery must be dismantled, the flowline/salesline waived or removed and the well site restored. The pipeline system is being sold to D&D Energy.
1863181414 2003-06-30 NOV follow up - to date the site has not been reclaimed and the tank battery is still in place. According to Steve Swain, the tank battery is used as a drip for the nearby sales line. Recent correspondence from Mr. Swain indicated that he is planning on selling his wells in Sagamore Hills by the end of August. If that occurs, there will be no reason not to complete the final restoration.
1868301126 2005-01-26 The equipment is still on site. Bob Ditty with D&D Energy is supposed to remove the equipemt and reclaim the well location and the tank battery location.
377691140 2005-08-09 Final restoration approved. Sent the landowner waiver to Mr. Silver for the lease road, gate and pipelines. NONEA
377691140 2005-08-09 Final restoration approved. Sent the landowner waiver to Mr. Silver for the lease road, gate and pipelines. NONEB
390373120 2003-03-26 Status check on final restoration. The well was plugged in 2000. The tank battery is still in place. The flow line, the fencing and the stone pad are still in place around the well head. According to Steve Swain, to 100 bbl stock tank is used for a pipeline drip. The equipment not in use must be removed and the area around the well head restored. NONEA
390373120 2003-03-26 Status check on final restoration. The well was plugged in 2000. The tank battery is still in place. The flow line, the fencing and the stone pad are still in place around the well head. According to Steve Swain, to 100 bbl stock tank is used for a pipeline drip. The equipment not in use must be removed and the area around the well head restored. NONEB
459999275 2003-03-26 FOLLOW UP TO NOV # 390373120 Status check on final restoration. The well was plugged in 2000. The tank battery is still in place. The flow line, the fencing and the stone pad are still in place around the well head. According to Steve Swain, to 100 bbl stock tank is used for a pipel NONEA
459999275 2003-03-26 FOLLOW UP TO NOV # 390373120 Status check on final restoration. The well was plugged in 2000. The tank battery is still in place. The flow line, the fencing and the stone pad are still in place around the well head. According to Steve Swain, to 100 bbl stock tank is used for a pipel NONEB
996597383 2005-07-11 The majority of the surface equipment has been removed and the well site restored. As soon as the remaining pieces are removed, the violation will be corrected and final restoration will be approved after obtaining a landowner waiver for the road and gate. D&D Energy is doing the work.
PL4727 Preliminary Restoration done information from Data Point