Well ID: 34-117-24235 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.5543280236,"lon":-82.7129195782,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2012-11-21 | |
Unconventional: | |
Horizontal: | |
Producing: No | |
Violations: 0 | |
Latitude: 40.5543280236 | |
Longitude: -82.7129195782 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
-133270688 | 2012-11-29 | G & H drilling reached total depth on the surface hole at 2022' 5:25 am. Circulate hole and lay down drill pipe and collars. 1:00 pm O's power tong start running 7" intermediate casing three joints off bottom and waiting on cementers. 6:00 pm went to finish running casing and was stuck approximately 1855'. | ||||
-1487249363 | 2012-12-06 | G & H finish running 4.5" casing and cement. Rigging down. | ||||
-1490132165 | 2012-11-28 | 11/28/2012 5:00 am G & H Drilling became differentially stuck at 1993' while making a connection. 3:00 pm lighten fluid weight from 10.6 pounds to 9.5 and aerate hole, pulled free and laid down five joints drill pipe, mix mud and circulate. | ||||
-1946842985 | 2013-05-13 | Inspected the Lanker #2 (#4235) as part of a standard productive well status check. The well is pumping by a Lufkin gas powered pump jack and the well pad is clean and free of excess contamination. The PVC flow line has not been buried. The storage consists of two tanks (#152536 & #152534) set in a dew dike. The well identification and emergency contact information is marked on the storage. Status: ok. | ||||
-62397712 | 2012-12-27 | Site is under heavy snow cover, unable to perform preliminary restoration. | ||||
-731763868 | 2012-11-23 | G & H back to drilling on fluid 190' at 2:00 pm. | ||||
1284670840 | 2013-07-17 | Inspected the Lanker #2 (#4235) as part of a standard productive well status check. Check well, storage and identification. The pvc flow line has been buried. Status: ok. | ||||
1353350542 | 2012-11-19 | G & H building location and has moved some drilling equipment on location. | ||||
1353511328 | 2012-11-20 | Met with Jeff Craig, G & H drilling supervisor. Inspected location, pits, flow line and discussed casing program, hydrogen sulfide conditions as well as drill-in procedures. | ||||
1353531625 | 2012-11-21 | G & H spud 10:45 with 15" bit on fluid. Total depth 60' run 59' new 11.75 conductor, not cemented. Shut down for Thanksgiving. | ||||
1353776611 | 2012-11-24 | 11/24/2012 11:45 am, O's power tong's and Petroset on location. G & H pulling drill collars. 1:30 pm O's start running surface casing. 3:00 pm three joints left, shut down to unfreeze air lines. 5:25 pm O's finish running surface casing, rig down. 5:45 pm. Petroset gained circulation and pump cement. Plug down 6:35 pm. | ||||
1354546998 | 2012-12-03 | Free up 7" intermediate casing, finish running to bottom and cement 11/30/2012. | ||||
1354633666 | 2012-12-04 | G & H drilling at 3521' on soap. Smudge pot is lit, flow line chained and staked , fire department notified. | ||||
1354724115 | 2012-12-05 | Total depth reached at 4014' in the Trempealeau 6:00 am. Mix mud and circulate. Plan to log with Appalachian well surveys and run 4.5" production casing. | ||||
1355155921 | 2012-12-10 | G & H has moved collars and drill pipe and mud pump off location. Rig still rigged up on hole. | ||||
1360592790 | 2013-02-11 | Completion testing has completed. The well has rods and tubing installed, waiting on pump jack and final hook-up. The drilling air pit is closed and the fluid pit was used during completion testing and remains lined and open and ice covered. Waiting on weather to complete preliminary restoration and put well into production. | ||||
1364396801 | 2013-03-27 | Storage tanks and pump jack set. Well pumping, officially on-line. | ||||
1365103204 | 2013-04-04 | All drilling pits are closed, debris removed and site initially graded. Top soil has not been replaced yet. Well is in production. | ||||
1368469166 | 2013-05-13 | Top soil has been replaced and the field has been planted. Preliminary restoration complete. | ||||
150008046 | 2012-11-26 | G & H drilling at 1302' of fluid. | ||||
1715210912 | 2013-01-14 | Berry well service has moved on location to begin completion testing. | ||||
1832688265 | 2012-11-30 | Still stuck in hole with 7" intermediate casing. Attempting to lighten fluid and mix starch. | ||||
2005994567 | 2012-11-01 | Inspected the R. Lanker #2 (#4235) as a well permitted status check. Received a call from G & H drilling that they are planning on drilling this well on fluid before the end of 2012. Permit issued: 9/30/2011 Expires: 9/29/2013. The well is staked, location is not built. | ||||
806202144 | 2012-11-27 | Drilling 1738' on fluid. | ||||
874525476 | 2012-12-07 | G & H Has completed drilling but has not rigged down, no one is working. |