X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-119-24681

Well Details

Well ID: 34-119-24681
Loading map...
County:
Municipality:
Operator Name:
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 1979-02-09
Unconventional:
Horizontal:
Producing: No
Violations: 6
Latitude: 39.7639190118
Longitude: -81.8232374107

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
-2093995444 2013-03-08 Compliance Notice has been resolved. The soil around the well head has been cleaned up and identification has been placed at well and at tank. Tanks have been moved and diked and contaminated soil has been removed and replaced.
1361544743 2013-02-21 Well is a producing well that has a pumping unit and 4.5casing x 1.5tubing well head. There is no identification at well head. Stuffing box is leaking at well head. There are two 100 barrel tanks by State Route 376 that ran over. The oil ran down over the tanks and made a contaminated spot. The spot is approximately 20x20. The company placed wood pete on the area. Place tanks 36appart and cleanup and remove contaminated soil. Tanks will be diked up to 110 percent of the capacity of the combined tanks. Place id at well head and at tanks. Failure to comply may result in Bond Forfeiture. The company has 10 days on the tank clean up and 30 days on the well to get in compliance. 9-1-07
1361544743 2013-02-21 Well is a producing well that has a pumping unit and 4.5casing x 1.5tubing well head. There is no identification at well head. Stuffing box is leaking at well head. There are two 100 barrel tanks by State Route 376 that ran over. The oil ran down over the tanks and made a contaminated spot. The spot is approximately 20x20. The company placed wood pete on the area. Place tanks 36appart and cleanup and remove contaminated soil. Tanks will be diked up to 110 percent of the capacity of the combined tanks. Place id at well head and at tanks. Failure to comply may result in Bond Forfeiture. The company has 10 days on the tank clean up and 30 days on the well to get in compliance. 9-9-05(A)1
1361544743 2013-02-21 Well is a producing well that has a pumping unit and 4.5casing x 1.5tubing well head. There is no identification at well head. Stuffing box is leaking at well head. There are two 100 barrel tanks by State Route 376 that ran over. The oil ran down over the tanks and made a contaminated spot. The spot is approximately 20x20. The company placed wood pete on the area. Place tanks 36appart and cleanup and remove contaminated soil. Tanks will be diked up to 110 percent of the capacity of the combined tanks. Place id at well head and at tanks. Failure to comply may result in Bond Forfeiture. The company has 10 days on the tank clean up and 30 days on the well to get in compliance. 9-9-05(A)10
1361544743 2013-02-21 Well is a producing well that has a pumping unit and 4.5casing x 1.5tubing well head. There is no identification at well head. Stuffing box is leaking at well head. There are two 100 barrel tanks by State Route 376 that ran over. The oil ran down over the tanks and made a contaminated spot. The spot is approximately 20x20. The company placed wood pete on the area. Place tanks 36appart and cleanup and remove contaminated soil. Tanks will be diked up to 110 percent of the capacity of the combined tanks. Place id at well head and at tanks. Failure to comply may result in Bond Forfeiture. The company has 10 days on the tank clean up and 30 days on the well to get in compliance. 9-9-05(A)2
1361544743 2013-02-21 Well is a producing well that has a pumping unit and 4.5casing x 1.5tubing well head. There is no identification at well head. Stuffing box is leaking at well head. There are two 100 barrel tanks by State Route 376 that ran over. The oil ran down over the tanks and made a contaminated spot. The spot is approximately 20x20. The company placed wood pete on the area. Place tanks 36appart and cleanup and remove contaminated soil. Tanks will be diked up to 110 percent of the capacity of the combined tanks. Place id at well head and at tanks. Failure to comply may result in Bond Forfeiture. The company has 10 days on the tank clean up and 30 days on the well to get in compliance. 9-9-05(A)9
1774038248 2006-08-24 FOLLOW UP TO NOV # 2104713842 Well is shut in. resolved on 3-8-13.
2104713842 2006-08-24 Well is shut in. NONE
713157749 2010-09-16 Well is producing, no problems noted.