Well ID: 34-035-22149 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.3301231311,"lon":-81.7193623724,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2010-05-05 | |
Unconventional: | |
Horizontal: | |
Producing: No | |
Violations: 0 | |
Latitude: 41.3301231311 | |
Longitude: -81.7193623724 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
-1322283266 | 2010-05-05 | cementing surface casing. | ||||
-1327870907 | 2011-10-25 | Urban Preliminary Inspection Due. Preliminary Restoration passed. | ||||
-1981330977 | 2010-04-20 | Held on site meeting to discuss on site construction and permit conditions. | ||||
-1992136168 | 2013-10-28 | The producing unit consists of a wellhead with pump jack and above-ground storage tank (AST) battery. The battery is comprised of 2 140-barrel steel production tanks, 1 50-barrel brine tank and separator unit plus Dominion metering run. Both the wellhead and battery are enclosed in separate chain-link fences. The gates and load-outs are locked. ID placard and secondary containment are good. Process safety gear (spark arrestor, low-pressure relief valve, carbon filter) is present. No problems noted. | ||||
-505209327 | 2010-05-05 | drilling 150" no violations. | ||||
-883957979 | 2010-05-06 | Cementing 85/8" casing | ||||
1167379931 | 2010-05-10 | cementing 4.5" casing .Company advised that there was no loss circulation or gas encountered while drilling. | ||||
1323396172 | 2011-12-08 | On 12/08/2012, DNR Inspector Richard Skidmore completed an urban production well inspection status check for DNR Inspector Ray Wallace. The lease road, tank battery, and well head locations are in compliance with 1501:9-9-05. Inspection passed. | ||||
1338341250 | 2010-05-07 | Witnessed BOP testing it passed. | ||||
1541075328 | 2010-04-26 | Held another onsite meeting to revise location of well. | ||||
1724274228 | 2010-05-04 | Cementing conductor 11.75 casing. | ||||
1937138300 | 2010-06-01 | Phone call from company informing me that the five day pressure test was 0 PSI for all five days. | ||||
2010425317 | 2012-11-06 | No changes since last inspection, visited well for observation accompanied by supervisor Tom Hill. Urban Preliminary Inspection passed. | ||||
480759108 | 2012-10-16 | My visit to the well today was twofold. The city of North Royalton had requested that Bass Energy relocate the access road to this well due to construction on city property adjacent to the original access road. Bass Energy notified me that this was accomplished in late August of 2012. The access road was constructed to best management practices for site construction and meets requirements of 1509:09-9-9-05. I conducted a well inspection while on location. Well head location is clean and in good operating condition. There is 180 Pounds pressure at the well head to the feed line. The tank battery has two (2) 140 Barrel storage tanks and caps are secure and in good condition. There is one (1) fifty barrel brine tank. There is a separator unit and a gas feed line unit. Fencing is chain link eight feet tall with three strands of barbed wire surrounding the top. Well is in compliance. No violations found. |