If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-089-26128 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.1008589618,"lon":-82.6460850742,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2013-05-28 | |
Unconventional: | |
Horizontal: | |
Producing: No | |
Violations: 0 | |
Latitude: 40.1008589618 | |
Longitude: -82.6460850742 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
-1278379918 | 2013-05-30 | I witnessed the cementing of the 8 inch surface casing for Knox Energy on Kilbarger rig 5. Bill Mitton with Knox Energy was on location. Petroset Cementing was contracted to cement the casing. Circulation was established. Partial cement returns were observed. A cement basket was not installed. | ||||
-1435228971 | 2013-07-16 | This inspection was conducted as a preliminary restoration status check. The well was equipped with a pumping unit and motor. The pits used during drilling have not been closed. Knox Energy will be closing the pits this week . | ||||
-1599051356 | 2013-05-29 | I inspected drilling operations today. Kilbarger rig 5 drilling on fluid during inspection. Depth was approximately 287 feet. No violations this date. | ||||
-731355902 | 2013-06-14 | I witnessed this frac job for Knox Energy. Producers Service Corp. was contracted to frac this well. Refer to stimulation report for details. | ||||
-78471032 | 2013-11-25 | This inspection was conducted as a preliminary restoration status check. The well was equipped with a pumping unit and motor. A GPS reading was taken at the wellhead. The well is located in an agricultural field. The area around the well has been restored. The tank battery consists of (1) 210 barrel tank and (2) 100 barrel tanks inside an earthen dike. A GPS reading was taken at the tank battery location. This well shares the tank battery with p# 3646. Identification posted at wellhead and tank battery. Inspection meets ORC 1509.072 requirements. Weather: 22 degrees F, Clear | ||||
1372869555 | 2013-05-31 | I inspected drilling operations today. Kilbarger rig #5 drilling on air with 7.88" bit. Depth approximately 1,680 feet during inspection. No violations this date. | ||||
573694346 | 2013-06-07 | Bill Mitton with Knox Energy called to inform me that the backside of the 8" surface casing had caved in approximately 15 feet down. He was called in a cement mixer to grout the backside of the casing from the surface with 9 sack grout. I witnessed this job and cement stayed at the surface. | ||||
790746894 | 2013-07-16 | I inspected this well location today. The well was equipped with a pumping unit and motor. The well was pumping during inspection. The drilling pits were open. Knox Energy will be closing the pits this week. |