34-153-21625

Well Details

Well ID: 34-153-21625
Loading map...
County:
Municipality:
Operator Name:
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 1984-04-26
Unconventional:
Horizontal:
Producing: No
Violations: 0
Latitude: 41.1716504624
Longitude: -81.6545967231

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
-1375128136 2010-03-15 Product recovery will continue as long as necessary. The affected area has been graded but will not be finished until the area dries later in the year.
-614855516 2010-05-27 Landmark is starting to reclaim the area of the pasture that was affected by the flowline leak.
1012228215 2010-03-10 The poly tank is in place and has been used for liquid recovery. A majority of the impacted soil has been removed and properly disposed of at the Petrocell facility in Lodi.
1268828001 2010-03-08 I received a call from Steve Swain with Landmark reporting a flowline leak from this well. The estimated loss was less than 5 bbl. The affected area was covered by snow but appeared to be confined to approximately 750 square feet of a horse pasture. The release came to surface and spread under the snow. The affected property owner contacted Landmark. The initial response by Landmark included containment and recovery. The oil was primarily contained in an excavated sump hole and the impacted snow/topsoil was stockpiled on plastic. Booms and sorbent pads were placed in the impacted area and down gradient from the release point. Recovery activity will include removing stockpiled soil and pumping the sump hole into a poly tank.
1757381552 2010-05-14 Talked to Steve Swain about finishing the reclamation at the flowline leak site. He said that work would begin as soon as the weather permitted.
96129183 2010-06-23 The flowline leak has been corrected and reclaimed.