If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-035-22062 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.5293658442,"lon":-81.441499984,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2008-09-08 | |
Unconventional: | |
Horizontal: | |
Producing: No | |
Violations: 0 | |
Latitude: 41.5293658442 | |
Longitude: -81.441499984 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
-1874728783 | 2009-04-27 | working on restoration | ||||
-974792379 | 2008-09-10 | setting surface | ||||
1097012384 | 2008-09-09 | cementing conductor | ||||
1168794053 | 2008-09-08 | location made | ||||
1231943501 | 2008-09-10 | called Mr Persiano's he said they are on his peroperty with water lines I advised him that company will remove lines As soon as posible. Called company talked with Lynn Stazy he will call mr Persiano's an rig crew to get water lines removed. | ||||
1233078982 | 2009-01-07 | area graded not seeded to cold | ||||
1331659339 | 2012-03-06 | An identification needs to be posted at the well head. The trash in the tank battery needs to be removed. Plugs need to be installed in both ends of tank battery drain. This drain should only be opened/used when a company representative is present. | ||||
1795464661 | 2010-08-04 | |||||
190829819 | 2008-09-15 | setting 4.5" | ||||
218312556 | 2008-09-08 | Location made ready for rig | ||||
494295515 | 2012-09-28 | The tank battery (TB) is enclosed within an 8-foot, wood slat style enclosure. The gate is locked. The TB is comprised of one, 210-barrel (BBL) production tank, one, 10 BBL poly brine tank, a mechanical separator and associated valves. The mechanicals are in good condition and the TB dike is present and intact. Tank spacing is good. The wellhead is enclosed within a 6-foot, wood slat enclosure. The wellhead is fitted with a plunger-lift system. I observed gas leaking or venting from the wellhead. I advised Cuyahoga County Inspector Ray Wallace about leaking gas and he indicated that he would follow up with the well owner. |