If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-121-24382 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.745851503,"lon":-81.4141137237,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2012-11-14 | |
Unconventional: | |
Horizontal: | |
Producing: No | |
Violations: 0 | |
Latitude: 39.745851503 | |
Longitude: -81.4141137237 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
-2087232296 | 2012-11-15 | Conductor job they ran 110' of 30" casing and cemented it in place with 520 sacks cement with six barrel of good returns. | ||||
-2102955238 | 2013-11-19 | The well site meets the preliminary restoration criteria. | ||||
1355772704 | 2012-12-16 | At 7:46 am I received a call from the drilling engineer stating that the blow line had blown apart and some material had escaped containment. Upon arrival I found that while drilling at 426' the blow line had plugged and parted. The driller was using nothing but air at the time. I ask the operator to roll up the straw mulch on the edge of site and replace it since it had cuttings on it. | ||||
158643371 | 2012-11-26 | Stopped at the location to check the status of the rig move. | ||||
232203772 | 2012-12-19 | On site to witness cementing of 13.375" casing driller ran 1991" of casing and Baker Hughes cemented it in place with 1400 sacks of Class I cement and they ran shoe on bottom and 16 centralize devices. |