If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-133-24445 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.276386886,"lon":-81.0129605653,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2013-01-10 | |
Unconventional: | |
Horizontal: | |
Producing: No | |
Violations: 0 | |
Latitude: 41.276386886 | |
Longitude: -81.0129605653 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
1985811433 | 2012-12-13 | I inspected this location to check the status of site construction and to collect new GPS readings of the well location. Mountaineer Keystone is in the process of re-permitting the wells on this pad and have re-staked the well locations 30' to the south of the previous locations and have reversed the numbering of the wells. The entrance and location have been stoned and the topsoil has been placed in a berm around the location and seeded. Compost filter socks have been staked outside the berms to prevent erosion around drainage areas. Site construction appears to be complete. No violations. | ||||
73233522 | 2013-01-08 | I was on location with north region supervisor Tom Hill to inspect the setting of the 20" conductor pipe for this horizontal well. Ziegenfuss Drilling was driving the casing through the unconsolidated sediments and into the bedrock with an air hammer attached to the bottom of the casing. The joints were 20' in length and being welded together as required. Current depth is 60' and there is no annulus so the conductor pipe will not require cementing. Stallion Construction was spotting housing trailers on location. No violations. |