34-115-24667

Well Details

Well ID: 34-115-24667
Loading map...
County:
Municipality:
Operator Name:
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2012-05-03
Unconventional:
Horizontal:
Producing: No
Violations: 0
Latitude: 39.6093728164
Longitude: -81.6668550196

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
-1242974023 2012-08-27
-1568720626 2012-05-16 Drill depth at time of inspection 805'ft.
-1638772768 2012-05-13 Witnessed surface casing being ran into well.
-1802275045 2012-08-30 I met with Jake Caplan this day and talked while watching the well be swabbed off. They started swabbing yesterday and will continue until tomorrow afternoon, hoping to get a show of oil or gas by then. 8/31/12 - still swabbing water, no hydrocarbons. Will continue into next week.
-1844743817 2012-05-22 Witnessed 9 5/8" casing ran and cemented back to surface, ran 1901'ft with 2 baskets placed at 183'ft and 63'ft from surface.
-1914983700 2012-05-02 Building well site, drilling rig moving in Thursday to set conductor.
-2132310721 2013-10-07 Well is still shut in and gates have been constructed around the wellhead. There is no production equipment on site. PDC stated they are waiting on surveyor to get them a plat so they can proceed with getting horizontal permits. They are planning at this time to convert this well into a UIC well should they get the landowner's approval. If they do not then they will plug the well.
-674998381 2012-06-11 Checked drilling rig at the depth of 7100'ft, will be running in 5 1/2" casing and cementing later today.
-760531403 2012-05-29 Witnessed 9 5/8" casing being ran and set 5450'ft, cement returned to approx. 1000'ft from surface.
-806858658 2012-08-03 Kelly from PDC called to say they will leave this well shut in for 30 days, possibly up to 100 days, in hopes of building pressure.
-916290914 2013-12-11 PDC has made the location ready for the arrival of the H & P 385 Flex Rig. They will be drilling three horizontals off of this pad. They have pulled the tubing, set two retrievable plugs, loaded the hole full of water, and installed a nightcap on this well in preparation for the new well activity. This was a temporary inactive well status checklist and there are no issues to report at this time.
1335543323 2012-04-26 Dan Goins and I went in to meet with Jamie Haga of PDC. Location was being built and the rain shut the crew down. Stumps would be chiped up.
1337198169 2012-05-16 Currently drilling at 805'.
1337614271 2012-05-10 Moving in Dallas-Morris Drlg to drill well, setting rig up at this time.
1338639236 2012-05-22 Cement returned to surface, plug down at 3:30 am.
1341602158 2012-07-06
1342561544 2012-07-17 My inspection this day to see progress of completion. I found flare still is not going, logging crew on location and swabbing well with that truck. Tubing has been run, frac tanks still all in place. They are swabbing water back into frac tank. Operator forgot to call before fracing, Mike says they used 7300 bbl water.
1348065044 2012-09-19 I accompanied Dan Goins to check status on well and it was found to be shut in after fracing operation. Well head has christmas tree installed and site location is acceptable. 17 frac tanks are still on location.
1471068922 2012-05-07 Main drilling rig moving in later in week.
1508255502 2012-05-22 Witnessed 13 3/8" casing being ran for intermediate string.
1614498401 2012-05-14 Cemented surface casing, had trouble installing cement head on casing.
830104606 2013-01-08 Upon inspection, I found all production equipment has been removed from location. The only thing on site is the wellhead equipped with christmas tree. Geologist from PDC stated they were waiting on Dominion pipeline.