Spud Date: 1996-09-03
Unconventional:
Horizontal:
Producing: No
Violations: 6
Latitude: 40.5869820476
Longitude: -82.7675151013

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
-1074311875 2014-07-08 Inspect well for integrity and pressure.
-1106463957 2013-02-20 Enhanced recovery well status check: Identification posted, well site clean and storage ok.
-1226153129 2014-07-24 Inspect Mullins Energy Services brine truck on-site for pressure test. Ohio license number PHW-8499. Brine, UIC number and other identification clearly and properly displayed. Status: ok.
-1253075010 2013-02-19 Conduct line pressure test with air. Pressue line up to 25 psi; the pressure held for 15 minutes. The operaor was given authorization to utilize the well for brine disposal.
-1334258075 2009-02-23 Chk well and storage, ok.
-1379860129 2013-02-19 On-site for flow line mechanical integrity test. Passed: Well can be placed into injection. Inspector Benko has details and forms.
-1474113756 2004-08-25 Follow up on NOV. The well has not been plugged or converted to Enhanced Production.
-1625203867 2011-10-11 Inspect well.
-167240608 2014-01-17 Inspected the Logan #1A (ERP #12) as part of a standard injection well status check. Check well, pressures, storage and identification. The operator has added the identification and emergency contact information to the storage. The storage dike is currently ice covered.
-1807824025 2014-04-24 Inspect well and tank battery. Location is ok.
-1832569712 2007-01-10 Talked w/Bob Wells (Pumper) and told him he needs to install a quarter inch tap on the annular space so that I can monitor the pressuers on the well. Advised him that I have already issued an NOV to Warpath Energy and that the tap needs to be installed ASAP or I may need to take further leagal action.
-1833371042 2003-07-07 Follow up on notice issued by Jeff Fry. The well has not been plugged or converted to salt water injection as of this date. I would recommend issuing a Chief's Order. 9-9-05(A)10
-1833371042 2003-07-07 Follow up on notice issued by Jeff Fry. The well has not been plugged or converted to salt water injection as of this date. I would recommend issuing a Chief's Order. NONE
-1896740206 2013-02-14 Inspect re-constructed dike area. Dike are measures 43 feet by 40 feet by 48 inches deep. One(1) new 210 bbl tank has been set on timbers. Identification is taped onto tank. Requested a line test to well head.
-1924847737 2014-08-25 Inspected the Logan #1A (ERP #4137) as part of a standard injection well status check. Inspect well, pressures, storage and identification. The operator has added a storage shed. Status: ok.
-1947276178 2014-07-24 Inspected the Logan #1A (ERP #12) as part of a standard injection well status check. Inspect well, pressures, storage, vault and identification. Status: ok.
-1957961847 2012-05-23 Inspect Well. Pit Liner has failed. Previous repair of line is substandard and inadequate. Fix and replace liner.
-2028362201 2013-12-12 Inspected the Logan (ERP #12) as part of a standard injection well status check. Check well, pressures, storage and identification. No change in status from previous inspection. The operator has not made corrective actions.
-209008957 2012-10-25 Inspected the Logan #1 (#4137) (ERP #12) as part of a standard injection well status check. Injection: zero Annulus: 350 psi. Replacement of the dike liner has not occurred.
-2121696734 2012-12-05 Inspect well for integrity and pressure. There has been no change or reconstruction of dike area as discussed and agreed upon.
-253493051 2010-03-29 Chk well and storage, ok.
-370136286 2014-01-23 Location Information. ENTRANCE: Lat. 40.59207 Long. -82.76642 / WELL HEAD: Lat. 40.52150 Long. -82.81357 / CENTER-OF-STORAGE: Lat. 40.58797 Long. -82.76673.
-380187884 2012-06-21 Preformed a follow up inspection on the Logan (ERP #12) regarding the pit liner as requested by Inspector Tom Benko. Cortland has repaired the liner by relining as an overlay three sides of the dike. The liner has been folder over to create double thickness. The sides relined are the south/west/north sides. The outer edges of the liner are secured by boards and fine limestone. 55% of the new liner is exposed to the elements on the dike walls. The liner is holding fresh rain water as seen by pooling around the tank. Pictures of the liner where sent to Inspector Benko 6/28/2012.
-426658598 2010-05-10 Chk well and storage ok.
-456216630 2009-06-24 Ok except that I could not open the valves on the annulus. Need bigger wrench. No fluid in the diked area at this time.
-603394488 2013-11-18 Inspected the Logan #1 (ERP #12) as part of a standard injection well status check. Check well, pressures, storage and identification. Status: No change in status from previous inspection, contacted operator.
-641714269 2014-07-16 On-site with UIC inspector Tom Benko as the operator modifies the storage facility according to the approved plan (6/27/2014). Three all fiberglass tanks (210 barrels) have been added as well as a new concrete, fully lined vault.
-652221388 2006-02-23 Chk well and storage, Ok.
-75775385 2008-09-03 Chk well and storage, No identification posted. Has positive pressure on annulus but not enough to measure.
-909557677 2012-08-30 Contacted operator by phone to report that the temporary fixes for the liner were not adequate and that the liner would need to be replaced.
-962903515 2011-05-09 Need to repair the liner in the diked area it has some holes in it close to the top of the dike. Also need to post identification.

2:00pm called and talked to Bob Masters and told him of the problems. He told me that he would get the liner repaired or replaced and post the identification.

1036523338 2002-11-05 Service rig removed. Well still has tubing and rods in it. Not capable of production or injection. Operator in past has proposed to convert this well to an injection well.
1073923234 2004-01-12 Well was to be converted to an injection well. Tubing and rods still in well . Valves closed. No activity.

One digital photo. Need to pursue further enforcement action.

1095082378 2004-09-13 On site for mechanical integrity test. Ran a new Parmaco HW packer to 3640' pressured up on the annulus would not hold. Shut down for the day.
1100875720 2004-11-19 Liner put down, and storage tank set. Using well at this time.
1104262170 2004-12-28 Chk well and storage, Ok. Site is snow covered. Shut down.
1168008662 2007-01-05 Warpath Energy Inc has done nothing to address the violations. No identification posted, no quarter inch tap on the annulus and the diked area is full of fluid at this time.
1210i5555520 2002-01-31 Service rig over hole. Part of rods were out. Well is not capable of production.Need to continue with injection well permit . Submit public notice or within 30 days P&A.
1255023396 2009-10-08 Chk well and storage, Ok. No fluid in diked area at this time.
1261058906 2009-12-17 Check well and storage, Id posted at the storage site.
1266305957 2005-10-06 No quarter inch tap on annulus, can not chk annulus pressure.
1280759002 2010-08-02 Check well and storage, Ok.
1294079650 2011-01-03 Can not open valve on annulus. Tank has run over at some point and has a small amount of oil in the diked area.
1297266610 2011-02-09 Check well and storage. Could not open valve on annulus due to the cold weather the valve is frozen. Approx temp 12 degrees F. Need to post new Id.
1313905919 2007-09-27 Follow up on NOV, Resolved 1/4 inch tap installed on annulus. Ok at this time.
1345577223 2012-08-21 Inspected the Logan (ERP #12) with Mr. Jeff Fry as part of a standard status check. Backside pressure 375 psi, injection on vacuum. Well identification is displayed at the storage. The dike contains one silver 210 barrel tank in a lined dike.
1357759326 2013-01-09 Operator began reconstruction of surface facility and removal of tank and old dike liner for replacement dike and liner. New dike area is anticipated to be 30 feet by 30 feet with 48 inch high dike. This construction design will be sufficient to hold two 210 bbl. Tanks. Construction activity included removal of pipe run, emptying tank, removal of tank from dike area, and removal ice and removal of water by vacuum truck. The old pit liner was tore by excavator and was subsequently removed. Construction activity conducted by Ken Pryor.
1359048681 2013-01-24 The liner replacement has begun. The old liner and tank have been removed and the dike has been rebuilt. Currently waiting on weather to set the liner and tank.
1359484701 2013-01-29 On site with Inspector Jeff Fry to witness replacement of the dike liner.
1363129344 2014-03-17 Inspected the Logan #1A (ERP #12) as part of a standard injection well status check. Inspect well, pressures, storage and identification. Status: unable to check pressures, pressure gauge malfunctioning.
1369711855 2014-07-28 Inspect well and surface facility. The tanks have been placed. The unloading pad has been constructed and the drain is connected to a concrete lined vault. The lines have been pressure tested. Checked the annulus of the well and the pressure is 410 psi. The well is on a strong vacuum.
1376070267 2013-08-09 Inspected the Logan #1 (#4137/ERP #12) as part of a standard injection well status check. Check well, storage and identification. No change in status from previous inspection, except the dike needs rain water pumped back into the storage. Status: Identification has not been posted (from last inspection 5-23-13), tested dike water: high chloride content contacted operator to evaluate. Will continue to monitor.
1405686594 2014-07-17 Inspect location. Operator has removed the steel 210 bbl tank and is replacing with three fiberglass tanks. Installed a concrete spray plastic lined vault.
1405703361 2014-07-18 On-site to witness construction of the concrete unload pad. Canaan Concrete built the forms (rebar reinforced) and Lexington Concrete poured the concrete. Built to plan specs with the addition of curbs parallel to the drain. Photo documented construction. Status: ok.
1406229478 2014-07-24 On-site accompanied by Inspector Jeff Fry, as a request from the operator for a flow line pressure test. Pressure tested flow line at 110 pounds for 15 minutes with zero loss. Status: passed and the operator is cleared to reconvene operations.
1406635436 2014-07-09 Inspect surface facility. The existing steel tank has been removed from the dike area in preparation of new tanks. Three 210 bbl fiberglass tanks were delivered to the site for installation. The manufacture is RPX Composites of Commodore, PA. The serial numbers are 200705-13571, 200706-13572, and 200707-13573.
1489307147 2012-10-03 Replacement of the dike liner has not started as of 10/03/2012.
1747299995 2014-07-18 Operator has a contractor scheduled to install and construct a new concrete unloading pad.
1826057688 2012-09-10 Inspected the Logan #1A (ERP #12) as a follow-up for Inspector Tom Benko. Cortland has verbally agreed to replace the entire dike liner. No work has started as of 9/10/2012.
1844094257 2014-04-17 Change of operator noted: George Woodcock dba West Drilling. New identification and emergency contact information has been posted.
191892232 2010-09-22 Check well and storage, tank appears to have run over at some time. Need to post Id.
1959975824 2013-05-23 The well has been converted to ERP. Preliminary restoration complete.
2059832166 2014-07-28 Inspect Mullins Energy Services Truck #3 UIC 25-538. Collect Brine sample from truck at unloading pad. Brine source is 3411722340 The Hohl #1.
2086455480 2005-06-08 Chk well and storage, Ok. Did not chk annulus no quarter inch tap.
240384081 2013-05-23 Inspect enhanced recovery well, storage and identification. Status: identification needs posted at storage and well, contacted operator.
277846138 2006-09-29 Chk well and storage, diked area has fluid in it and needs to be empied. No identification, no quarter inch tap for annualr space. 9-5-09(A)(3)
277846138 2006-09-29 Chk well and storage, diked area has fluid in it and needs to be empied. No identification, no quarter inch tap for annualr space. NONE(H)
383014237 2008-03-06 Wwell head is ice covered. Dyke is full of fluid and forzen.
406070744 2014-07-24 Inspector Eric Daugstrup and myself witnessed an injection line test for Tom Benko. Test passed with no loss. We met new well owner George Woodcock. See Eric's report for this date on details.
464733866 2007-05-16 No quarter inch tap on annulus.
481640901 2007-10-31 Chk well and storage, Ok.
692892257 2008-12-11 Chk well and storage, Ok.
860449212 2013-02-14 Cortland is preparing to put the well back into injection. Pressure testing of the flow line is schedule for 2/19/2013.
880782253 2005-12-14 Chk well and storage,ok.
96023023 2013-09-30 Inspected the Logan #1A (ERP #12) as part of a standard injection well status check. Check well, storage and identification. No change in status from previous inspection: the identification and emergency contact information is not posted and the dike needs emptied of excess water. Status: contacted operator . Will continue to monitor.
970721939 2012-02-23 Inspect Well.
9966979 2014-07-21 Inspect well location. Concrete unloading pad has been poured and is in place. Drain vault is in place and has been buried. Three fiberglass tanks have been set and piping has been installed.
CENT2172 1997-10-20 1501:9-1-07 9-1-07
CENT2174 1997-10-20 1501:9-9-05 9-9-05(A)10