If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-081-61059 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.5063246876,"lon":-80.6895322577,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: | |
Unconventional: | |
Horizontal: | |
Producing: | |
Violations: 0 | |
Latitude: 40.5063246876 | |
Longitude: -80.6895322577 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
-1039163342 | 2013-09-27 | The rig has been moved to this well to being plugging. The rods were pulled from the well and the 1" tubing was started before the day ended. The well will be clear of tubing Monday and the first cement plug can be set. | ||||
-1181257766 | 2013-10-01 | I stopped on location to check the plugging of this well. The first cement plug has been set and Appalachian will be onsite tomorrow to log the well to determine how much of the 7" casing that we can pull to set the final cement plug. | ||||
1380681693 | 2013-09-30 | I was onsite to check the status of the plugging of this well. The 1" tubing has been pulled and the 2" is currently being pulled. The tubing is flowing oil currently due to the well gassing but it is being contained. The first cement plug will be set tomorrow. | ||||
87658515 | 2013-10-10 | I checked the cement level of this well after 2 cement plugs were run on it after pulling casing. The cement is 2' from surface and will be not an issue when the wellhead is cut down below grade as per law. |