X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-067-21201

Well Details

Well ID: 34-067-21201
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Google
Image may be subject to copyright
County:
Municipality:
Operator Name:
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2013-08-12
Unconventional:
Horizontal:
Producing: No
Violations: 0
Latitude: 40.359879616
Longitude: -81.0594923223

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
-1527135637 2014-07-08 They are putting down the liner and the pads in preparation to pumping out the conductor holes before moving the rig in
-1538772217 2013-10-08 I am here today to check on the drilling status of Nomac Rig # 290 and found that they were able to get the drill string unstuck and finish the vertical section of the well. The rig has moved off and another rig will move in to finish drilling the well to total depth.
1378816765 2013-09-10 I am on site today to witness the running and the cementing of the 9-5/8" inch diameter casing string. Nomac Drilling 290 drilled a 12-1/4" inch diameter hole to 2217 ft and set 2220 ft of casing. Schlumberger Cementing Service c/w 805 sacks of class A 15.5 lb cement with 1.2 yield. They had 25 bbl of cement returns.
1379504483 2013-09-16 I am on site today to check on the rig status. I found that Nomac Drilling Rig # 290 is stuck in the hole at 6400ft and running a wireline down to find a free point.
533728603 2013-08-12 Precision Drilling has two rigs on site today to drill conductor holes. The conductor should be drilled and ready to cement tonight or Tues.
BESbswy