If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-089-26102 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.0237875554,"lon":-82.387117841,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2014-05-22 | |
Unconventional: | |
Horizontal: | |
Producing: No | |
Violations: 0 | |
Latitude: 40.0237875554 | |
Longitude: -82.387117841 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
-1052685819 | 2014-07-16 | With Brandon Mitchell. Witness new Berea well being shot. See Brandon's report for this date. | ||||
-1217211668 | 2014-07-16 | This inspection was conducted as a status check. I was accompanied by Jeff Fry. The well has been drilled in. We witnessed Donnie Nethers shoot the well during the inspection with 90 lbs. of nitro gel. No violations. | ||||
-1273081574 | 2014-05-22 | Inspect drilling operations. Mike and Jeremy McDonald have moved in rig. They were rigging up and well was spudded during inspection. | ||||
-1655954520 | 2014-06-27 | Dale McDonald ran 23 joints (500 feet) of used 17 pound, 5 inch surface casing open ended under the old well construction permit conditions. 3:05 pm Cemenco hooked up and attempted to gain circulation: unable to gain circulation. Displaced 25 sacks class A cement, plug down 3:30 pm, no returns-to-surface. Cemenco grout from surface 15 sacks of Class A cement. Emplacement and cementing of the surface casing on the Weekley #9 co-witnessed by Mr. Dale McDonald. | ||||
-337870956 | 2014-07-02 | I inspected drilling operations today. No activity during inspection. Pit level ok. No violations. | ||||
-386263199 | 2014-07-07 | I inspected drilling operations today. The well has reached total depth. Jeremy McDonald was bailing oil during inspection. No violations. | ||||
-620140673 | 2014-06-24 | Drilling operations are ongoing, the rig was setting idle today and no one was on site during this inspection. There were no violations. | ||||
1023938312 | 2014-06-17 | I inspected drilling operations today accompanied by Jeff Fry. Jeremy McDonald drilling during inspection. The depth was approximately 330 feet. No violations. |