34-055-21633

Well Details

Well ID: 34-055-21633
Loading map...
County:
Municipality:
Operator Name:
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2005-11-08
Unconventional:
Horizontal:
Producing: No
Violations: 2
Latitude: 41.569203974
Longitude: -81.2994069352

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
-1240404499 2006-08-07 Inspected site and found tree stumps being removed and location being graded.
-162228034 2006-08-02 Meeting with Glen Battles,Mike Joyce zoning, and township Inspector. Reviewed the restoration problems and time schedule. Advised Mr. Battles that the work would start Aug. 3, 2006.
-1676183548 2006-07-31 FOLLOW UP TO NOV # 1154525281 Inspected site found area rough graded No vegetation established; erosion is occurring on site .Contacted company talked with Ted With TK Gas oilfield services advised him to get site into compliance. Inspected site found area rough graded No vegetation established; erosion is occurring on site .Contacted company talked with Ted With TK Gas oilfield services advised him to get site into compliance. NONEC
-1937449069 2013-06-11 My inspection found the well to be equipped with a plunger lift unit. The annulus valve is closed. The well and tank battery are in good repair and are surrounded by a chain link fence. The tank battery consists of a 100 BBL production tank, a 50 BBL poly brine tank, and a mechanical separator. The production tank vent is plumbed into a 55 gallon charcoal filter. Then it is plumbed up to a spark arrestor. The proper identification is located on the tank battery and the wellhead. The lease road is in stable condition.
-542759215 2006-07-26 Met with Glen Battles relevant to restoration problems. Well site is rough graded and trees and tree stumps are mixed in with the soil. He wanted the trees for fire wood but changed his mind due to mud on the trees. The stumps were going to be burried on
-788741974 2006-08-14 Inspected Well site and found area graded,seeded, and mulch.
1154525281 2006-07-31 Inspected site found area rough graded No vegetation established; erosion is occurring on site .Contacted company talked with Ted With TK Gas oilfield services advised him to get site into compliance. NONEC
1201245543 2006-08-03 Arrived on site and met with Mr. Battles, Dave Hill Rep. For Alliance Petroleum, and Contractor TK Gas. Reviewed site.
139980669 2005-11-09
1734285196 2008-10-01 Well site has been graded and vegetation is established. Well is a rabbit well. Lease road is stable and constructed out of durable material. There is a lot of over flow from the road construction. In areas there is an extra 2 to 3 feet of base material. Tank battery is landscaped. One poly tank and one 100BBL tank, mechanical separator in battery. Well head and tank battery man doors are locked. Charcoal filter and spark arrestor are in place. 6 foot fence with three strands of barbed wire around tank battery and well head. Gate at the head of the lease road.
566781212 2006-08-04 Inspected well location and found tree stumps being removed and area being graded.
878855131 2006-02-08 on site to check lease rd possible causing sedimentation company on site working on lease road.