Well Details

Well ID: 34-059-24089
Loading map...
County:
Municipality:
Operator Name:
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2008-09-18
Unconventional:
Horizontal:
Producing: No
Violations: 0
Latitude: 40.0953212307
Longitude: -81.6377115101

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
-1002871638 2008-09-22 WARREN DRILLING AT 3015'
-1380348869 2008-10-01 PIT MT'D
-508109238 2012-05-16 On the day of my inspection I found four inch well casing with tubing standing out of the ground, the tubing is leading into a separator/ drip and (1) two hundred ten barrel production tank, the I.D.is posted on the tank.
-600741705 2008-09-18 CALLED OUT TO RUN AND CEMENT CONDUCTOR HOLE. 158' 13.5" PIPE. MUD RING ENCOUTERED GOING BACK IN HOLE WITH PIPE. ATTEMPT TO WASH PIPE DOWN. FAILED.SENT CEMENT CREW HOME. 11:15 PM.
1221837646 2008-09-19 DRILLING CONDUCTOR HOLE. ENCOUNTERED MUD RING WHEN COMING OUT. STARTED RUN PIPE. HIT HARD. ATTEMPT TO WASH DOWN PIPE. SENT CEMENT HOME. RUN MAGNET TO BOTTOM. COULD NOT GET ON TO SLEDGE HAMMER THAT WAS DROPPED DOWN HOLE WHILE PULLING 13.5" CONDUCTOR. START TO CIRCULATE HOLE AND WILL ATTEMPT TO GO BACK IN WITH MAGNET TO GET ON TO SLEDGE HAMMER. 11:30 AM.
2028824860 2008-09-22 BOP TEST CONDUCTED
2076965388 2008-09-16 WARREN DRILLING. MOVE ON RIG UP.
770502081 2010-01-14 Inspection revealed that restoration work at site is satisfactory, well is equipped with 8' surface casing and 4.5' production casing and 2.375" tubing and 1-210 bbl tank and separator within dike area.