Well ID: 34-055-22077 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.5052968643,"lon":-81.328843374,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2008-12-06 | |
Unconventional: | |
Horizontal: | |
Producing: No | |
Violations: 1 | |
Latitude: 41.5052968643 | |
Longitude: -81.328843374 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
-1019462596 | 2013-06-14 | My inspection found the well to be equipped with a plunger lift unit. The annulus valve was open to a pop off valve that was plumbed into the production tank. The well and tank battery are in good repair and are surrounded by a chain link fence. The tank battery consists of a 100 BBL production tank, a 50 BBL poly brine tank, and a mechanical separator. The vent off of the production tank is plumbed into a 55 gallon charcoal filter and then up into a spark arrestor. The proper identification is located on the tank battery. The lease road is in stable condition. | ||||
-1589329733 | 2009-07-29 | No lock on man door to the well. 45psi on the annulus. Preliminary restoration is in good repair. Can be passed once lock is installed on the man door to the well head. Install a lock on the man door to the well head. | 9-9-02 | |||
-2025604905 | 2009-10-30 | Locks are on all man doors. Site has been graded, seeded and vegetation is established. Fences are up identification sign is up. Lease road gates have been installed. Operator mulched dike, dike is in very good repair. Well is in production. | ||||
-2034738135 | 2008-12-10 | Drill depth 3406'. Mike Cutter on site. Drainage controls need repaired, informed Mike, he will have them fixed. Pits are in good repair. Requested that operator place absorbent pads were 90 weight oil has leaked. | ||||
-268550862 | 2008-12-11 | Site is in good repair. Lease road is stable. Pits are in good repair. Operator finished running Geo log. Top of the Lockport 3122'. Operator will be running long string and cementing. | ||||
1228248476 | 2008-12-02 | Met Mr. Palmer on site, he was building site at the time of inspection. Lease road has been installed. ID sign posted at the entrance. Silt fence installed east side of the lease road per the permit. Lease road is rock. Pits have been constructed, pit bottoms are dry, soil is clay and sand. Operator has topsoil stockpiles northeast corner of affected area and south west corner. Silt fence has been installed south, southeast and south west side of site. Operator installed a diversion ditch west side of the lease road. Requested that silt fence and straw bails be installed in the ditch to prevent erosion and sedimentation into the road ditch. Site is stable and in good repair. | ||||
1228742116 | 2008-12-07 | On site for surface cement. Pits are in good repair. Drainage controls are in place. Operator ran new 20lb pipe, 6 joints. Good circulation before and during job. Drift in the area was 176' in depth, drift ended at the top of the Berea. 38' of Berea in at the location. Operator mixed cement till it came to surface, then displaced. 17 BBL return of cement to surface. Cement held at surface. #2 diesel had been spilled behind the rig. Requested that snow with #2 diesel on it be cleaned up. Area is not a flood plain, flood plain permit conditions were waived 11-03-2008 by me, after consult with Geauga Soil and Water. | ||||
1228759360 | 2008-12-08 | Drill depth 2032', drilling on air/fluid mix. Operator is going to switch over to fluid drilling only, next connection. Pits are in good repair. Safety fence is up backside of pits. Drainage controls are in place. Lease road is stable and in good repair. Eric Poulson on site at the time of inspection. | ||||
298273691 | 2008-12-15 | Rig has moved offsite. Pits are in good repair. Fluid level is 2 feet below top of pits. No pressure valve on annulus. Reminded company gauge needs installed. They will have it on today. |