X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-121-24415

Well Details

Well ID: 34-121-24415
Loading map...
County:
Municipality:
Operator Name:
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2013-05-18
Unconventional:
Horizontal:
Producing: No
Violations: 0
Latitude: 39.8375763533
Longitude: -81.3929380404

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
-1303428412 2013-09-27 My inspection today finds the rig is hung in the hole at 2059'. They will continue to attempt to free the pipe.
1155471381 2013-05-30 My inspection today finds that Redstone has reached a total depth of 332' of 26" hole. They are preparing to run casing.
1380131150 2013-09-25 My inspection today finds the rig has successfully fished out a dropped joint of drill pipe. They are preparing to drill the 12.25" section.
1380720400 2013-09-30 My inspection today finds the rig is currently drilling 17.5" hole at a depth of 3275'.
1477750378 2013-06-14 My inspection today finds Calfrac is running 1" tubing between the 20" casing and the conductor. They then circulated 400 sks of class A cement. I witnessed 7 bbl of cement return to surface. The operator will run a casing integrity test at a later date.
1995988807 2014-03-12 I am accompanied by Randy Adkins. My inspection finds the drilling rig is being moved in on the site. The company modified the location in order to get the rig to fit.
271803483 2013-05-19 My inspection today finds the drilling operator, Redstone, has ran 102' of 30" casing. Cal-Frac is on site to cement the casing in place with 302 sks of class A cement.