X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-085-21213

Well Details

Well ID: 34-085-21213
Loading map...
County:
Municipality:
Operator Name:
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2007-06-20
Unconventional:
Horizontal:
Producing: No
Violations: 0
Latitude: 41.674323043
Longitude: -81.4241598069

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
-1561996433 2009-07-22 in complance.
-1854531860 2009-11-12 There were no violations at the time.
-777986797 2007-06-21 Operator was repairing pit liner at the time of inspection. Leak was located, operator was pumping pit down, so that they would be able to reline the pit. Operator was waiting on cement to set. Inspected drill bit, bit was new and in good repair. Operator called at 4:45pm BOP test was at 5:45 unable to attend BOP test.
-79863487 2009-09-16 Preliminary restoration was completed.
1182274352 2007-06-19 Operator is constructing pits. During excavation operator hit a green drain tile, was attempting to locate a replacement at the time of inspection. Operator also hit the remains of a foundation of a building while digging the pits. Location of the pits is in fill material. Operator needs to get a permit on site before any more site construction is completed. All permit conditions need to be followed.
1182526871 2007-06-21 On site for surface cement. Operator set CND last night. Operator informed me that the pit linear had a leak, the fluid was flowing threw the fill material that the pits were constructed on and into a creek. Fluid was fresh water with Gel that was used to treat the fill material. Operator was pumping down pit into tanks, to locate the leak. Operator is going to draw down the pit, reline the pit. Surface cement went well, good returns.
1312377647 2011-08-02 Lease road stable. Spacing, dike in compliance. Vent hatches installed and closed. Feed lines are bullplugged. Lightning arrestor and charcoal filter installed. No violations at this time.
1351862471 2012-10-04 The unit consists of a 2-tank battery with mechanical separator enclosed in a 8-foot chainlink fence. The spacing is in accordance with the rule, and the valving and mechanicals are in good repair. I did not observe any signs of leaking product or gas vapors. The wellhead is fitted with a mechanical lift device and is located in a separate gated 6-foot chainlink enclosure. The gates on the enclosures are locked. The tank battery dike is adequate. No violations noted.
310684507 2012-03-12 This well is equipped with a plunger lift system. The tank battery is equipped with two 100 barrel production tanks, one 1500 gallon poly brine tank, a mechanical separator and the meter run. Equipment spacing is correct. The tank battery is fenced and the dike is in good repair. Identification signs are posted on the tank battery and the well. The man doors are locked. The lease road is stable and constructed out of durable material.