If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-045-21323 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.9308806778,"lon":-82.7010696159,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2011-07-29 | |
Unconventional: | |
Horizontal: | |
Producing: No | |
Violations: 3 | |
Latitude: 39.9308806778 | |
Longitude: -82.7010696159 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
-103889557 | 2011-07-31 | I witnessed the cementing of the surface casing. The cement was verified with Phenolphthalein solution, 1%. Good returns were observed and cement stayed at the surface. Both the surface and conductor hole were drilled on fluid. Note: Circulation lost prior to surface job at approx 250'. Returned to the location later this evening and witnessed the BOP test. The BOP passsed the required test. | ||||
-1354289099 | 2011-07-29 | I witnessed the cementing of the 11.75" casing (conductor pipe). | ||||
-205704633 | 2014-08-04 | I called Mark Smith with PEP drilling. I informed Mark of the need to plug this well. They have a valid plug permit. Mark said they are moving a rig in two weeks to plug this well. | ||||
-645588335 | 2011-08-06 | I witnessed the cementing of 4.5" casing (longstring). | ||||
1091468302 | 2014-06-03 | Status check inspection. This well was drilled in 2011 in a urban area. The fencing around the tank battery and pumping unit has been started but not finished. There are no locks and there no access road. I have contacted P.E.P. drilling supervisor Mark Smith by telephone. I left him a message at 1400 hours. | 9-05E2 | |||
1091468302 | 2014-06-03 | Status check inspection. This well was drilled in 2011 in a urban area. The fencing around the tank battery and pumping unit has been started but not finished. There are no locks and there no access road. I have contacted P.E.P. drilling supervisor Mark Smith by telephone. I left him a message at 1400 hours. | 9-05E3 | |||
1091468302 | 2014-06-03 | Status check inspection. This well was drilled in 2011 in a urban area. The fencing around the tank battery and pumping unit has been started but not finished. There are no locks and there no access road. I have contacted P.E.P. drilling supervisor Mark Smith by telephone. I left him a message at 1400 hours. | 9-1-02 | |||
1798974998 | 2011-07-06 | A pre-site inspection of this location was conducted with Mr. Bill Marks and Mineral Resource Inspector, Josh Garland. | ||||
2013488144 | 2011-08-16 | I witnessed the solidification of drilling pits. | ||||
48169502 | 2012-12-05 | I performed a inspection on this urban well, fence is partially constructed, site needs finished, I have contacted PEP Drilling. |