If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-153-21884 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.0216610176,"lon":-81.5681524513,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 1984-07-28 | |
Unconventional: | |
Horizontal: | |
Producing: No | |
Violations: 0 | |
Latitude: 41.0216610176 | |
Longitude: -81.5681524513 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
-1728986611 | 2004-10-19 | Status check inspection - no violations at this time. | ||||
-2059343670 | 2003-06-18 | Solution mining status check - no violations at this time. | ||||
732822418 | 2009-06-08 | Annual inspection found no violations at this time. | ||||
953566330 | 2005-11-17 | Completed the 5-year MIT for this well. On site personnel included Dan Zerbe and Benny Moyer both representing Cargill. The reference well was the 7" casing in this well. From 0900 to 1700, the average pressure change was 0.012 psi/hour. The following values were generated during the test:
Time Test P Ref. P Diff. Time Test P Ref. P Diff. 0900 532.234 165.784 366.450 1400 533.977 167.630 366.347 1000 532.646 166.367 366.279 1500 534.238 167.899 366.339 1100 533.054 166.765 366.289 1600 534.483 168.139 366.344 1200 533.424 167.070 366.354 1700 534.621 168.263 366.358 1300 533.726 167.364 366.362 |