34-059-23986

Well Details

Well ID: 34-059-23986
Loading map...
County:
Municipality:
Operator Name:
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2005-07-13
Unconventional:
Horizontal:
Producing: No
Violations: 2
Latitude: 40.027372247
Longitude: -81.511011226

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
-1012267939 2014-09-04 Kilbarger rig 17 has reached total depth of 9008' and during my inspection it was noted that rig crew was mixing drilling mud to condition the wellbore before they come out of the hole laying down drill string.
-1100288992 2007-04-10 NOV WRITTEN FOR IDLE WELL AND RESTORATION
-1355632714 2005-07-14 PEP DRILLING,TD. HOLE AT 8043'PULL DRILL PIPE. STAND BACK TO LOG HOLE. DRY HOLE. RUN DRILL PIPE BACK IN, PICK UP COLLARS GO BACK TO BOTTOM, GETTING READY TO PLUG WELL BACK TO BEREA. CALLED HALLIBURTON, COMING FROM PENNSYLVANIA TO PLUG WELL.
-1711651942 2007-04-10 PRELIMENARY RESTORATION HAS NOT YET BEEN PERFORMED. WELL SITE NEEDS GRADED SEEDED MULCHED TO ESTBLISH VEGETATION NONEB
-1730260426 2008-05-22 FINAL RESTORATION
-1792524280 2005-07-07 PEP DRILLING AT 6230. MOVE MUD LOGGERS ON, RIG UP MUD LOGGER.
-1830224645 2005-07-14 PLUG BACK WELL TO BEREA.CEMENT ARRIVED AT 7:00 P.M. HALLIBURTON. STARTED PLUGGING AT 8:15 P.M.
-192666909 2008-01-14 TAG TOP OF CEMENT AT 950' TO HIGH UP PIPE FOR BEREA. TO PLUG WELL TOMORROW.
-317301796 2008-01-15 WELL PLUGGED. NOV RESOLVED
-383936387 2014-08-25 Inspection revealed that Kilbarger Rig 17 is moving in on site to reopen plugged well and then convert it too a SWIW well.

Note: Witnessed welder work on getting new wellhead put on existing surface casing and once they get to drilling out plugs we will test BOP assembly before drilling out plug at the bottom of surface casing.

-607241134 2008-02-25 WELL IS PLUGGED. NOV RESOLVED.
1119961295 2005-06-27 PEP DRILLING DRILLING AT 815'
1120839026 2005-07-08 STATUS CHECK. PEP DRILLING. 6749'
1121344778 2005-07-13 TD. 8048'. NO SHOWS ON MUD LOG. WILL LOG HOLE BEFORE DECISION IS MADE TO PLUG OR RUN PIPE.
1206439788 2005-07-11 PEP DRILLING DRILLING AT 7450' TRIP FOR BIT. LOST IN HOLE.
1221754096 2008-09-18 NOV RESOLVED WELL PLUGGED, FINAL RESTORATION
1312439827 2007-04-10 WELL WAS DRILLED BY ENERVEST TO ROSE RUN. DRY HOLE. KNOX ENERGY TOOK OVER WELL AT THIS POINT AND PLUGGED BACK TO BEREA. AMPLE AMOUNT OF TIME HAS BEEN GIVEN TO PUT WELL INTO PRODUCTION AND COMPANY HAS FAILED TO DO SO 92 (2 YRS.) NONE
1408483235 2014-08-19 Inspection revealed that equipment is on site building site and I witnessed the placing of cellar and they cemented it in place and they also sealed the bottom with 2' of cement and owner will wait on drilling rig to move in on site before placing weld on wellhead in place.
1559824304 2008-09-12 WELL PLUGGED RESTORATION COMPLETE NOV RESOLVED
2105715670 2005-07-05 PEP DRILLING, GOING BACK IN HOLE, SHUT DOWN FOR JULY 4TH HOLIDAY. 5300'
278873157 2014-08-27 On site to test BOP stack they pressure tested at 500# with a seven pound loss in fifth teen minute test period noting that they had one leak at a union connection and once it was repaired we retested at 560# with no loss in pressure.
806854438 2005-07-12 PEP DRILLING AT 7894' . TWO SMALL SHOWS OF GAS ON FLUID.