X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-153-22661

Well Details

Well ID: 34-153-22661
Loading map...
County:
Municipality:
Operator Name:
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 1990-08-28
Unconventional:
Horizontal:
Producing: No
Violations: 0
Latitude: 41.1545205664
Longitude: -81.6284861953

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
1345387631 2012-03-30 The recent failure of an earthen dam located west of the Billman wellhead has exposed the flowline to the tank battery. I advised them to shut the well in to prevent the possibility of a release from the flowline. St. Croix instead has stated that they intend to reenforce the flowline with added support and are monitoring the facility. The inspection of the tank battery found that the Billman stock tank has rusted through and is no longer being used and must be removed. Instead liquid production from the Billman is being directed to one of the other stock tanks in the tank battery. The other tanks in the tank battery have recently been patched and may need to be replaced. Minor amounts of staining were present below the patches. The gates to the tank battery were not locked as required. Failure to address these concerns by May 15 will result in a written violation.
1345387631 2012-03-30 The recent failure of an earthen dam located west of the Billman wellhead has exposed the flowline adjacent to the dam. I advised St. Croix to shut the well in to prevent the possibility of a release from the flowline. St. Croix instead has stated that they intend to reinforce the flowline with added support and are monitoring the facility. The inspection of the tank battery found that the Billman stock tank has rusted through and is no longer being used and must be removed as required by 1501:9-9-05 (E)(5). Instead, liquid production from the Billman is being directed to one of the other stock tanks in the tank battery. The other tanks in the tank battery have recently been patched and may need to be replaced. Minor amounts of staining were present below the patches and should be remediated/removed. The gates to the tank battery were not locked as required by 1501:9-9-05 (3). Failure to address these concerns by May 15 will result in a written violation.
PL4139 Preliminary Restoration done information from Data Point