If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-117-24238 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.4873361215,"lon":-82.8168340642,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2012-05-22 | |
Unconventional: | |
Horizontal: | |
Producing: No | |
Violations: 0 | |
Latitude: 40.4873361215 | |
Longitude: -82.8168340642 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
-1188659776 | 2012-05-31 | Kilbarger #1 drilling ahead 2900' (fluid). Top of Trenton (drillers) 2755'. Mike Griffith is mudlogging using Tom Atha's trailer and equipment. | ||||
-225938661 | 2012-05-30 | Kilbarger #1 drilling ahead 2228'. | ||||
-457052578 | 2014-06-19 | Inspected the Laroche Family Trust #1 (#4238) as part of a standard production well status check. Inspect well, storage and identification. Status: ok. | ||||
-780844885 | 2013-06-13 | Inspected the Laroche Family Trust as part of a standard productive well status check. The well is pumping by a gas powered Alten pump jack and the well pad is clean and free of excess contamination. The storage consists of two tanks (#15166 & #151165) and a steel brine tank set in a gravel lined dike. The well needs the identification posted. Status: contacted operator and will continue to monitor. | ||||
-792814911 | 2112-06-01 | Kilbarger #1 reached total depth at 3467' 7:00 a.m. in the Trempealeau. | ||||
1337627421 | 2012-06-07 | The preliminary restoration has been completed on the Laroche Family Trust #2. All pits have been closed, filled-in and compacted. All trash and drilling debris has been removed. The well is waiting on completion. | ||||
1341578868 | 2012-05-22 | Kilbarger #1 move in and spud at 3:30 p.m. set 77' of 11.75 new conductor. Not cemented. | ||||
1371129746 | 2013-06-13 | The Laroche #2 is in production, preliminary restoration completed. | ||||
1381511468 | 2013-10-12 | The operator has posted the well identification and emergency contact information at the storage. Status: ok. | ||||
1403188977 | 2014-06-19 | Location Information for the Laroche Family Trust #2 (#4238). ENTRANCE: Lat. 40.48794 Long. -82.82018 / WELL HEAD: Lat. 40.48739 Long. -82.81686 / CENTER-OF-STORAGE: Lat. 40.48750 Long. -82.81726. | ||||
1723420089 | 2013-04-04 | Well is in production. Preliminary restoration passed. | ||||
314718658 | 2012-05-29 | Kilbarger #1 back to drilling (air) 1613' 45/min per kelly with pdc bit. | ||||
859918949 | 2012-05-25 | Kilbarger #1 drilling 1403' (air), will pull-up into surface casing and shut down for Memorial day. | ||||
970479228 | 2012-06-27 | Well has been completed and rods installed and is currently being hooked up by Kenny Smith welding. A used Alten pump jack is on location and is being repaired. Two new 210 barrel tanks have been set on a gravel pad an are being plumbed to the well. Waiting on brine tank and separator. |